Development Description
(a) demolish existing shed, (b) construct a new shed for storage of a boat, (c) all other associated ancillary site works
Kerry County Council / 25293
(a) demolish existing shed, (b) construct a new shed for storage of a boat, (c) all other associated ancillary site works
(a) demolish existing shed, (b) construct a new shed for storage of a boat, (c) all other associated ancillary site works
Project lifecycle links
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Kerry County Council
Contextual resources
See this authority's related leads, appeals, tenders and historical commencements.
Rough-check planning application fees before quoting or filing.
Safety statement, RAMS, AF notices, training cards and site templates.
Useful when this lead implies contractor, PSCS or site-safety demand.
Check survey and pre-works duties before demolition or refurbishment.
Browse ACP and planning appeal records for professional follow-up.
Same county
A 10 year permission for the following- 40 no. two storey semi-detached and terraced residential dwellings (6 no. 2 Beds, 22 no. 3 beds & 12 no. 4 beds), 68 no. in curtilage parking spaces, shared open spaces, emergency vehicle access from Lovers Lane, ...
Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to ...
full planning permission to (a) demolish existing old derelict cottage (b) to build a new dwelling house and (c) treatment unit and soil polishing filter and all associated site works
(1)DEMOLITION OF DERELICT PREFABRICATED CLASSROOM AND TOILET BLOCK TO REAR OF OLD SCHOOL; (2) CONSTRUCTION OF A CARPARK ANCILLARY TO THE EXISTING SCHOOL TO INCLUDE BUS SET DOWN AREA, DROP-OFF/PICK-UP PARKING AREA AND STAFF PARKING AREA; (3) REALIGNMENT OF E...
a) Demolition of an existing Agri Retail Store, b) the construction of a new Agri Retail Store and ancillary storage, c) internal modification to an existing storage building, d) the erection of totem signage, e) all associated site works.