Demolition, ESB Networks Killarney Business & Technology Park, Tiernaboul, Co...
The Electricity Supply Board (ESB) are seeking Planning Permission for new entrance and security arrangements consisting of; (a) The erection of 135m of Palisade fencing (2.4m high), to form new boundary between ESB & EIR Operational Depots and; (b) the installation of 2 No. 5m wide sliding security access gates to control...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 4 Apr 2025. / Confidence: LowDecision date 4 Apr 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The Electricity Supply Board (ESB) are seeking Planning Permission for new entrance and security arrangements consisting of; (a) The erection of 135m of Palisade fencing (2.4m high), to form new boundary between ESB & EIR Operational Depots and; (b) the installation of 2 No. 5m wide sliding security access gates to control access to ESB area, consisting of 2 No. gate panels, 5m wide x 2.4m high, Innova 280 Models, and; (c) The demolition of an existing security hut (3.5m x 3.5m x 3.5m) at the existing entrance of...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kerry County Council
- Exact reference
- 2560071
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Demolition
The public application record identifies demolition in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Kerry planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The Electricity Supply Board (ESB) are seeking Planning Permission for new entrance and security arrangements consisting of; (a) The erection of 135m of Palisade fencing (2.4m high), to form new boundary between ESB & EIR Operational Depots and; (b) the installation of 2 No. 5m wide sliding security access gates to control access to ESB area, consisting of 2 No. gate panels, 5m wide x 2.4m high, Innova 280 Models, and; (c) The demolition of an existing security hut (3.5m x 3.5m x 3.5m) at the existing entrance of the depot yard and; (d) the demolition of the existing entrance arrangement including, 1 No. 6m roller gate and 1 No. 6m Mesh swing gate, and associated 2 No. connected pillars at the entrance of the property, and; (e) the erection of 10 No. CCTV cameras on 4.5m high poles and 3 No. CCTV cameras fixed to existing buildings, and; (f) the installation of 2 No. swing palisade gates to secure access to eir area, consisting of 2 No. 2m wide x 2.4m high, and 4m of palisade fencing, 2.4m high. The application includes all ancillary works associated with the development located at the existing depot.
Application to site progress
-
Applied 11 Feb 2025 2560071
-
Decision Conditional 4 Apr 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560071
The Electricity Supply Board (ESB) are seeking Planning Permission for new entrance and security arrangements consisting of; (a) The erection of 135m of Palisade fencing (2.4m high), to form new boundary between ESB & EIR Operational Depots and; (b) the installation of 2 No. 5m wide sliding security access gates to control access to ESB area, consisting of 2 No. gate panels, 5m wide x 2.4m high, Innova 280 Models, and; (c) The demolition of an existing security hut (3.5m x 3.5m x 3.5m) at the existing entrance of the depot yard and; (d) the demolition of the existing entrance arrangement including, 1 No. 6m roller gate and 1 No. 6m Mesh swing gate, and associated 2 No. connected pillars at the entrance of the property, and; (e) the erection of 10 No. CCTV cameras on 4.5m high poles and 3 No. CCTV cameras fixed to existing buildings, and; (f) the installation of 2 No. swing palisade gates to secure access to eir area, consisting of 2 No. 2m wide x 2.4m high, and 4m of palisade fencing, 2.4m high. The application includes all ancillary works associated with the development located at the existing depot.
Open official record