Development Description
Retention permission to retain existing dwelling as built on site, retain existing garage and clothes drying lean-to as built on site, retain existing gazebo as built on site, retain the relocation of the treatment unit and percolation area from the north to the south of the site and the relocation of the front entrance from the west to the east side of the site complete with all ancillary site works associated with same within revised site boundaries on our site and Planning Permission to decommission the existing wastewater treatment system and install a new wastewater treatment unit and sandcel filter
Map
No coordinates supplied in the public planning feed.