Temporary/event · Co. Kerry

Ballyoughtragh South Commons, Farranmanagh Knocknaman and Lisheennashingane (Townlands), Milltown County Kerry

Under appeal since 26 Aug 2026 (Granted 11 Aug 2026 by the council)

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560856 at Ballyoughtragh South Commons, Farranmanagh Knocknaman and Lisheennashingane (Townlands), Milltown County Kerry: 10 year planning permission for a solar farm.
  • The applicant is Laurel Ridge Solar Farm Ltd. The agent is Hw Planning.
  • It was received by Kerry County Council on 22 Sep 2025.
  • Status: Under appeal since 26 Aug 2026 (Granted 11 Aug 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Kerry County Council planning register, checked 2 Sep 2026. Open the council's file

Planning applications in Co. Kerry

What and where

10 year planning permission for a solar farm

REDIII: A 10 year planning permission for a solar farm, 38kV substation and underground cabling grid connection, and energy storage compound with a total area of circa 57 hectares. The proposed development will consist of a solar farm comprising of c.230,000 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 14 no. single storey electrical transformer stations. The energy storage compound will consist of 36 no. containerised energy storage modules and associated plant and equipment, 9 no. transformers and 2 no. auxiliary transformers, 2 no. spare parts containers and 1. no. office unit. Planning permission is also sought for 1 no. 38kV substation and associated electrical compound, including single storey control building, line bay, transformer and accompanying apparatus, and associated grid connection between the proposed substation and Oughtragh 110kV substation comprising 38kV underground electricity cabling of c.3.87km in length to be provided in an excavated trench on private lands and the L11003, L8003 and L80030 public roads, and all associated site development and reinstatement works. The project will also include 33kV underground interconnector electrical cabling within the development site and within the L11003 public road, temporary construction compounds, security fencing, CCTV, access tracks, landscaping (including hedgerow removal and planting), drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 6 no. entrances from the L11003 and L80030, with 1 no. of these entrances used for the temporary construction phase only. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Location
Co. Kerry Map
Planning reference
2560856
Applicant
Laurel Ridge Solar Farm Ltd

Numbers and dates

Project type
Temporary/event
Received
22 Sep 2025
Council decision
11 Aug 2026
Appeal lodged
26 Aug 2026

Timeline

  1. Application received
  2. Granted by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

The council notification dated 11 August 2026 conditionally decides to grant the application. Commission appeal 501954, lodged 26 August 2026, remains pending. The originalSeptember 2025 technical report and later 2026 drainage responses are kept separate; no overallMW/MWh capacity or construction start is inferred.

3 official documents inspected · Checked 2026-09-05 · Official file index

The decision identifies the storage modules and a distinct grid route

Council decision under appeal · Kerry 2560856; distinguish solar equipment, storage equipment and the grid connection

What the evidence says
The council notification dated 11 August 2026 describes 36 energy-storage modules with nine transformers and two auxiliary transformers, alongside the solar farm and its separate 14 transformer stations. It identifies approximately 3.87 km of 38 kV underground connection to Oughtragh 110 kV substation. This is a conditional council decision under appeal, not a completed installation.

Why it may matter — interpretation
Interpretation: preserves the separate equipment groups and electrical scopes without adding unlike quantities.

What is not established
No final appeal decision, installed equipment, purchased models or reconciled overall generation/storage capacity is established.

Inspect the evidence

Council notification of decision and conditions · p.1
36 no. containerized energy storage modules · Issued 2026-08-11 · Ten-year planning permission and forty-year operational term; decision under appeal · Checked 2026-09-05

36 no. containerized energy storage modules

The original design uses driven galvanised steel posts and string inverters

Original technical proposal before further information · Original solar-array and inverter design before later further-information submissions

What the evidence says
The September 2025 fire assessment describes solar frames fixed to driven galvanised steel posts, tilted between 10 and 25 degrees. It proposes string inverters at array ends and underground AC cabling to transformer kiosks. These are source-specific planning details from the original submission.

Why it may matter — interpretation
Interpretation for solar and electrical construction: identifies mounting and distribution work without treating a generic description as a selected product.

What is not established
No final pile design, inverter brand, measured cable length, installed specification or later coordinated equipment schedule is established.

Inspect the evidence

Solar farm and storage fire-safety assessment · p.7
galvanised steel posts · Issued 2025-09-18 · Revision 0; received 22 September 2025; original planning submission · Checked 2026-09-05

galvanised steel posts

Solar farm and storage fire-safety assessment · p.8
string inverters · Issued 2025-09-18 · Revision 0; received 22 September 2025; original planning submission · Checked 2026-09-05

string inverters

The battery table presents alternatives, not one selected duty

Original alternatives; final selection not established · Two options in the September 2025 energy-storage assessment; not a final procurement schedule

What the evidence says
The original assessment describes 36 modular storage containers and shows two lithium-iron-phosphate configurations: a four-hour option at 1,200 kW and a two-hour option at 2,350 kW. Both table columns state 5,016 kWh nameplate capacity and liquid cooling. It does not select one duty or prove that multiplying a table value by the planned module count gives the final project capacity.

Why it may matter — interpretation
Interpretation for storage and grid equipment: supplies concrete source parameters while keeping the configuration choice unresolved.

What is not established
No chosen option, manufacturer, usable site-wide capacity, final project MW/MWh, procurement or installation is established.

Inspect the evidence

Solar farm and storage fire-safety assessment · p.9
36 no. modular containers · Issued 2025-09-18 · Revision 0; received 22 September 2025; original planning submission · Checked 2026-09-05

36 no. modular containers

Solar farm and storage fire-safety assessment · p.10
5016 kWh · Issued 2025-09-18 · Revision 0; received 22 September 2025; original planning submission · Checked 2026-09-05

5016 kWh

Battery protection features remain supplier-dependent

Original alternatives; final selection not established · Typical features described in the original energy-storage fire assessment

What the evidence says
The report explicitly says storage safety features vary by supplier. It lists battery management, smoke and heat detection, combustible-gas detection, active ventilation and separate alarm/backup-power arrangements as typical protection features. That list is not a verified final installed safety system or a compliance certification.

Why it may matter — interpretation
Interpretation for fire and controls work: identifies systems that need to be checked against the eventual chosen equipment and agreed design.

What is not established
Selected detector types, safety-system design, product certification and installed protection are not established.

Inspect the evidence

Solar farm and storage fire-safety assessment · p.12
vary between suppliers · Issued 2025-09-18 · Revision 0; received 22 September 2025; original planning submission · Checked 2026-09-05

vary between suppliers

Further information adds stone drains, trench soakaways and an oil separator

Further-information response; council decision under appeal · Further-information drainage response for the array areas and substation; separate catchments

What the evidence says
The later planner assessment records revised stone land drains and large trench soakaways at middle and lower boundaries of the array areas. It also describes substation runoff passing through a bypass oil separator before a dedicated soakaway. These are the submitted drainage responses assessed at council stage.

Why it may matter — interpretation
Interpretation for civil and drainage work: identifies the component types and their distinct locations without inventing sizes or volumes.

What is not established
No pipe schedule, soakaway capacity, separator model, final construction drawings or completed drainage installation is established.

Inspect the evidence

Planner assessment of further information · p.2
bypass oil separator · Issued 2026-08-10 · Signed 10 August 2026; assesses 2026 further-information responses · Checked 2026-09-05

bypass oil separator
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. The council index contains 262 parsed document rows. Three PDFs were accessed and selected rendered pages of those three support these findings. The remaining catalogue and later equipment drawings have not been fully inspected. Proposals do not establish procurement or installed work.

How we know this

From the Kerry County Council planning register, checked 2 Sep 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Co. Kerry

Get alerts for Co. KerryFree. We email you when new applications appear.

Free email alerts

Get new Kerry projects by email

New applications, decisions and site starts in Co. Kerry. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options