Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 9 Apr 2026. / Confidence: LowDecision date 9 Apr 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kerry County Council
- Exact reference
- 2561153
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure - 1 dwellings
The public application record identifies 1 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Electricity Supply Board ESB
- Planning agent
- Maria Rochford
- Agent address
- 1 Stokes Place Dublin 2 Dublin D02 DE03
More Kerry planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006 m² gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0 m² and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0 m² and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85 m², c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m² and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works.
Application to site progress
-
Applied 10 Dec 2025 2561153
-
Decision Conditional 9 Apr 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2561153
Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006 m² gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0 m² and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0 m² and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85 m², c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m² and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works.
Open official record