Planning record · Co. Kerry
Planning application, Near Listowel, Co. Kerry
Decision due 26 Nov 2026
Key facts
- Planning application 2660792 at Near Listowel, Co. Kerry: Planning application.
- The applicant is Circal Trienearagh Solar Ltd. The agent is India Costello.
- It was received by Kerry County Council on 21 Aug 2026.
- Status: Decision due 26 Nov 2026.
- The council's decision is due on 26 Nov 2026. Building work can only follow a grant of permission.
Source: the Kerry County Council planning register, checked 19 Nov 2026. Open the council's file
What and where
Planning application
We, Circal Trienearagh Solar Limited, intend to apply for permission for development on lands in the townlands of Ballygarret, Gortanimerisk, Knockaderren, Knockavallig, Knockundervaul, Lacka West, Lisroe, Toor and Trienearagh, near Listowel, Co. Kerry (the Proposed Development) which comprises a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development comprises the following: I. Construction and operation of up to 576,850 m² of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. II. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. III. Up to 23 no. electrical inverter / transformer skid units. IV. Construction and operational access to the site by 16 no. site entrances using 14 no. existing field access points and 2 no. new access points. V. 7 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. VI. Construction of a 110kV / 33 kV transformer compound including an IPP Control Module of 33 m², a MV Switchgear Module of 33 m², all associated electrical plant and apparatus, 2 no c.18m lightning masts, lighting columns, fencing, parking, wastewater holding tank, rainwater harvesting unit, 33kV underground cabling, and a 110kV under the fence cable connection to the existing Trien 110 kV Substation. VII. 33 kV collector cable network, joint bays and associated works. VIII. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. IX. The decommissioning and reinstatement of the solar farm at the end of its operational life, including proposed transformer compound. The application seeks a 10-year permission with an operational lifetime of 40 years from the date of commissioning of the entire solar farm is being sought. A Natura Impact Statement (NIS) has been prepared in respect of the construction, operation and decommissioning of the Proposed Development and accompanies the planning application. Refer to enclosed statutory notices for full development description.
- Location
- Near Listowel, Co. Kerry Map
- Council
- Kerry County Council
- Planning reference
- 2660792
- Application type
- Permission
- Applicant
- Circal Trienearagh Solar Ltd
- Agent
- India Costello
Numbers and dates
- Project type
- Planning record
- Received
- 21 Aug 2026
- Decision due
- 26 Nov 2026
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660792 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kerry County Council planning register, checked 19 Nov 2026. We link to the council's own file so you can check the official record before you act.
Explore the area