Planning application · Co. Kildare
Rochford Green, Rochford Abbey, Kill, Co. Kildare
Granted 10 Apr 2019 (final grant issued 27 May 2019)
We no longer update this application, so we can't email you about it. Get new planning applications in Kill by email
Key facts
- Planning application 181409 at Rochford Green, Rochford Abbey, Kill, Co. Kildare: 9 homes.
- It was received by Kildare County Council on 22 Nov 2018.
- Status: Granted 10 Apr 2019 (final grant issued 27 May 2019).
Source: the Kildare County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Kill · Planning applications in Co. Kildare
Council register
The council's register shows: Granted on 10 Apr 2019.
Search the Kildare planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
9 homes
1. Construction of two blocks each with four number three bedroom two storey terraced houses; 2. Construction of a detached four bedroom two storey dwelling; 3. For the completion of access roads, footpaths and public lighting to serve the proposed development; 4. For connection to the existing adjoining foul and surface water sewers and connection to adjoining water-mains; 5. For the provision of car parking facilities and public open spaces and; 6. For all associated site development works. Revised by significant further information consisting of; 1.The relocation of blocks 1 & 2 so that the separation distances to the adjoining boundaries has been increased as so that block 1 follows the same building line as the adjoining dwellings. 2. The redesign of blocks 2 & 3 so the overall ridge heights have been reduced and that there are only dormer windows located on the rear elevations of the dwelling 3.The proposed developments pedestrian footpaths now connect to the footpath of the adjoining Glendara Estate. 4. The road surface will be finished in a finished surface course of 45mm of Stone Mastic Asphalt, SMA 14 surf PMB 65/106-60 des, in compliance with with clause 942 of NRA/TII specification
- Location
- Kill, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 181409
Numbers and dates
- Homes
- 9
- Floor area
- 992 m²
- Estimated construction value
- €1.5m to €1.9mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Received
- 22 Nov 2018
- Decision to grant
- 10 Apr 2019
- Final grant
- 27 May 2019
- Site start notified
- 4 Mar 2020
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 181409 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kildare County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 4 Mar 2020Notice filed · Construction of 9 number dwelling and all associates site development works.View the site start
- Completion certificate recordedRecorded in Mar 2020 · 4 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.
- Completion certificate recordedRecorded in Mar 2020 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.
- Completion certificate recordedRecorded in Mar 2020 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 20 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.