Planning application · Co. Kildare
Church Street & Bridge Street, Kilcock, Co. Kildare.
Granted 19 Aug 2020 (final grant issued 22 Sep 2020)
We no longer update this application, so we can't email you about it. Get new planning applications in Kilcock by email
Key facts
- Planning application 191296 at Church Street & Bridge Street, Kilcock, Co. Kildare.: ~39 homes.
- It was received by Kildare County Council on 19 Nov 2019.
- Status: Granted 19 Aug 2020 (final grant issued 22 Sep 2020).
- Work was due to start on 6 Jun 2023, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Kildare County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Kilcock · Planning applications in Co. Kildare
Council register
The council's register shows: Granted on 19 Aug 2020.
Search the Kildare planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
~39 homes
for development on site area of 0.445ha, located at Church Street and Bridge Street, Kilcock, Co. Kildare. The site is occupied by The Lion House (former public house) which is a Protected Structure (RPS Ref. No. B05-20) on Church Street. The proposed development site fronts onto Church Street to the north-east, is bounded to the rear (south-west) by the Royal Canal and to the east by Bridge Street. There are 5 no. existing outbuildings/sheds on the site that are proposed to be demolished, as is an extension to the rear of The Lion House. The proposed development will be a long term 'Build-to-Rent' residential development. It is proposed to build a new 2 storey extension to the rear of the existing Lion House building and to convert same into a build-to-rent shared accommodation comprising 18 no. bedspaces in 9 no. bedrooms at first floor level, with communal living facilities provided at ground floor level. The proposed development also consists of 39 no. studios and apartments, comprised of 2 no. studios, 7 no. 1 bed apartments, 26 no. 2 bed apartments & 4 no. 3 bed apartments, accommodated in 4 no. 3-4 storey buildings. Block A, fronting onto Bridge Street, is a 3 storey building accommodating reception, communal living area, gym, and cinema at ground floor level with 6 no. 1 & 2 bed apartments and 2 no. studios overhead. Block B located at the western boundary of the site is a 3 storey building with 4th floor setback accommodating 18 no. 1, 2 & 3 bed apartments. Block C to the rear of the site is a 3 storey building with 4th floor setback accommodating 11 no. 1 & 2 bed apartments, over an undercroft car park. Block D fronting onto Bridge Street is a 3 storey building that will contain concierge & laundry facilities at ground floor level with 2 no. 2 bed apartments overhead. The proposed development will be accessed off Bridge Street via a new vehicular entrance, with proposed pedestrian/cyclist access into the adjoining site to the west (concurrent planning application). Bicycle and car parking will be provided for at surface level and in an undercroft car park at Block C. The proposed development provides for all associated site development works, open spaces, landscaping, boundary treatments & bin storage. Revised by Significant Further Information
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Kilcock, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 191296
Numbers and dates
- Homes
- ~39estimated from the application
- Received
- 19 Nov 2019
- Decision to grant
- 19 Aug 2020
- Final grant
- 22 Sep 2020
- Site start notified
- 6 Jun 2023
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 191296 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kildare County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 6 Jun 2023Notice filed · phase 1 · The construction of Block D at Bridge Street and Church Street, Kilcock, Co. Kildare...View the site start
- 14 Aug 2023Notice filed · phase 2 · The construction of Block A at Bridge Street and Church Street, Kilcock, Co. Kildare...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area