Infrastructure · Co. Kildare

at the former Lidl Distribution Centre, Great Connell Business Park, Great Connell Newbridge, Co. Kildare

Granted 13 Aug 2020 (final grant issued 17 Sep 2020)

We no longer update this application, so we can't email you about it. Get new planning applications in Co. Kildare by email

Key facts

  • Planning application 20259 at At The Former Lidl Distribution Centre, Great Connell Business Park, Great Connell Newbridge, Co. Kildare: Change of use.
  • It was received by Kildare County Council on 12 Mar 2020.
  • Status: Granted 13 Aug 2020 (final grant issued 17 Sep 2020).

Source: the Kildare County Council planning register, as last seen on 2 Jun 2026. Open the council's file

Planning applications in Co. Kildare

Council register

The council's register shows: Granted on 13 Aug 2020.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Change of use

a seven-year permission for development for the change of use of the (distribution) warehouse element of the development (identified as Blocks B, C, D, E, F, G, H, J, K1 and L) to beverage manufacturing use, including construction of additional development identified as Blocks K2 and M, respectively, and for ancillary works; and for retention permission for development (for the retention of an additional 376 m² of office accommodation in the permitted three-storey office block (Block A), and for the retention of an additional 789 m of development in the permitted warehouse) (Blocks B, C, D, E, F, G, H, J, K1 and L), on a site of 7.42 ha approximately, at the former Lidl Distribution Centre, Great Connell Business Park, Greatconnell, Newbridge, County Kildare, W12 NN23. (The permitted use of the existing office block (Block A) (4,138 sq m, inclusive of the retention area) is not affected.) The gross floor area of the premises (inclusive of retention areas) will increase from 31,986 sq m to 34,191 sq m, an increase of 2,205 sq m. The beverage manufacturing facility is designed to be delivered in two phases, identified as Phases 1 and 2 respectively. (An overflow carpark located to the south west of the subject site does not form part of the Application.) etc. Please see Newspaper Notice for full description: The development will also consist of the construction of; revised vehicular, cyclist and pedestrian access; reconfiguration of part of the existing permitted car parking to provide 209 No. car parking spaces (inclusive of electric car charging points), 40 No. bicycle parking spaces and associated infrastructure; goods’ intake and storage areas; external chiller and condensing units and associated louvre screening; a tank farm comprising of 10 No. tanks and associated stairs, gantries, and enclosures to a tank height of 4.5m above yard level (Block K2); a wastewater treatment plant (consisting of 2 No. aeration and 2 No. equalisation tanks with associated pipework, stairs, gantries, and enclosures to a tank height of 5.5 metres above yard level) (Block M); 1 No. sludge press, DAF water treatment, associated chemical storage, blower and plant room building to a height of 4 metres above yard level and 1 No. sprinkler tank, 5.5 metres above yard level, and associated pump house and site wide ancillary barrier and bollard protections; the provision of revised lighting, etc. Please see Newspaper Notice for full description

Description as published by the council. Its text starts part-way through a sentence.

Location
Great Connell Newbridge, Co. Kildare Map
Planning reference
20259

Numbers and dates

Floor area
31,986 m²
Project type
Infrastructure
Received
12 Mar 2020
Decision to grant
13 Aug 2020
Final grant
17 Sep 2020
Site start notified
2 Oct 2020

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Documents and evidence

Check the record

  • Council planning fileThe application file 20259 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Kildare County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 2 Oct 2020Notice filed · Material change of use to part of the former Regional Distribution Warehouse to form a...View the site start
  2. Partial completion certificate recordedRecorded in Oct 2020 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  3. Partial completion certificate recordedRecorded in Oct 2020 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Great Connell Newbridge

Get alerts for Co. KildareFree. We email you when new applications appear.

Free email alerts

Get new Kildare projects by email

New applications, decisions and site starts in Co. Kildare. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options