Planning application · Co. Kildare
Monasterevin, Kildare
Granted 22 Jun 2023 (final grant issued 22 Nov 2023)
Key facts
- Site start record 221035 at Monasterevin, Co. Kildare: ~4 homes.
- The planning authority is Kildare County Council.
- Status: Granted 22 Jun 2023 (final grant issued 22 Nov 2023).
Source: the Kildare County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Monasterevin · Planning applications in Co. Kildare
Council register
The council's register shows: Granted on 22 Jun 2023.
Search the Kildare planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
~4 homes
Commencement Notice the provision of a renewable biogas and biofertiliser production facility with an intake of up to 165,000 tonnes of feedstock per annum that will feed into the existing Gas Networks Ireland (GNI) network. The facility will comprise of: *Input weigh bridges and weighbridge offices; *Reception (incorporating offices, control room/laboratory, canteen, changing and toilet facilities) *Feedstock building and solid digestate store; *Boiler/plant maintenance including ESB and CHP store; *4 No digestor units and 1 No post digester unit, pre-acidification unit, biological desulphurisation and technical building all located within a containment bund; *Covered storage tanks; * Silage clamps; *Connection to existing Gas Network Ireland infrastructure The proposed development includes for associated biogas tank; gas upgrade units (5 no.); and an emergency gas flare. The development also includes air cleaner (feedstock area); 5 no. air cleaner stacks and 2 no. boiler and CHP plant flues; odour abatement, firefighting water tank; attenuation pond, a new gated access from R445; internal access roads, car parking, loading bays and laybys, landscaping and boundary fencing. A personnel gate is proposed to the north of the site. The proposed development comprises all associated site development, drainage and infrastructure works above and below ground. The maximum height of the proposed development is the digester units at c.141m above ground level. The proposed facility will primarily utilise spent grains from breweries along with smaller quantities of other brewery by products such as yeast and discarded beer. Maize will also be accepted in smaller quantities as a feedstock to produce biogas which will be upgraded to bio methane and fed into the natural gas grid. Carbon Dioxide will be recovered as a by-product as part of the process. Solid and liquid digestate that will be produced from the process will be a biofertiliser. No waste materials will be accepted as feedstock at the facility. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development on a site of approx. 7.9Ha. Revised by Significant Further Information which consists of revisions to the site access and works to the road and footpath alongside the site including the provision of public lighting, signage, anti-skid surfacing and a crash barrier. Tactile paving and dropped kerbs are proposed where required and there are c
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Monasterevin, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 221035
- Application type
- Commencement Notice
- Owner named on the notice
- Evergreen Agricultural Enterprises Ltd
- Agent named on the notice
- Evergreen Agricultural Enterprises Ltd
Numbers and dates
- Homes
- ~4estimated from the application
- Estimated construction value
- €590k to €870kOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Received
- 23 Aug 2022
- Decision to grant
- 22 Jun 2023
- Final grant
- 22 Nov 2023
- Site start notified
- 11 Sep 2024
Documents and evidence
Check the record
- Council planning fileThe application file 221035 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealAppeal withdrawn S.140(1)(a) · 317610 / 12 Sep 2023View the appeal record
How we know this
From the Kildare County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 11 Sep 2024Notice filed · phase 1 · Phase 1 – Site set up, ground investigation works, working platforms–Sept Nov 2024, no...View the site start
- 18 Jun 2025Notice filed · phase 2 · Phase 2 -Proposed single storey biogas facility with ancillary two storey officeView the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area