Small residential · Co. Kildare
Former Retronix Semiconductor Factory, Dublin Road, Celbridge, Co. Kildare
Granted 31 Oct 2024 (final grant issued 16 Dec 2024)
We no longer update this application, so we can't email you about it. Get new planning applications in Celbridge by email
Key facts
- Planning application 231057 at Former Retronix Semiconductor Factory, Dublin Road, Celbridge, Co. Kildare: Infrastructure works are also proposed on the Dublin Road.
- It was received by Kildare County Council on 21 Dec 2023.
- Status: Granted 31 Oct 2024 (final grant issued 16 Dec 2024).
- Work was due to start on 8 May 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Kildare County Council planning register, as last seen on 11 Jun 2026. Open the council's file
More planning applications in Celbridge · Planning applications in Co. Kildare
Council register
The council's register shows: Granted on 31 Oct 2024.
Search the Kildare planning register
Application details as we last saw them in the national register on 11 Jun 2026.
What and where
Infrastructure works are also proposed on the Dublin Road
Development at a c. 1.22 Ha site at the Former Retronix Semiconductor Factory, Dublin Road, Celbridge, Co. Kildare W23 TR58. Infrastructure works are also proposed on the Dublin Road and on lands to the southeast of the main development site. The total area of the development site and the infrastructure works measures c. 1.26 Ha. The principal development will consist of: the demolition of the vacant factory (c. 1,720 sq.m); and the construction of a 44 No. unit residential development comprising 28 No. two storey houses (10 No. 2 bed units and 18 No. 3 bed units ranging in size from c.83 sq. m to c. 116 sq. m) and a three storey building comprising 16 No. apartment and duplex apartment units (6 No. 1 bed units and 10 No. 2 bed units ranging in size from c.53 sq.m to c.113 sq.m). The development will also include: the extinguishment of the existing site entrance and the provision of a new site entrance onto the Dublin Road; works to link in to the adjoining Ballyoulster SHD site under consideration (An Bord Pleanála Case Reference TA09.313825) including the continuation of the footpath and cycle lane proposed along the boundary of the subject site on the Dublin Road and the provision of pedestrian and cyclist connections; internal roads and footpaths; 50 No. car parking spaces; bicycle parking; bicycle and bin store; hard and soft landscaping; boundary treatments; lighting; drainage works including the upgrading and reuse of the exiting foul water connection into the existing outfall manhole, and the relaying (in its current alignment) of the existing surface water pipe to its existing outfall; and all other associated site and development works above and below ground
- Location
- Celbridge, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 231057
Numbers and dates
- Project type
- Small residential
- Received
- 21 Dec 2023
- Decision to grant
- 31 Oct 2024
- Final grant
- 16 Dec 2024
- Site start notified
- 8 May 2026
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 231057 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kildare County Council planning register, as last seen on 11 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 8 May 2026Notice filed · phase 1 · 28 No Dwellings at 17-44 (Inc) Donaghcumper Gate, Celbridge, County Kildare.View the site start
- 10 Sep 2026Notice filed · phase 2 · 16 Units in a Duplex Block, 08, at 1-16 (Inc) Donaghcumper Gate, Celbridge, County...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.