Commercial new build · Co. Kildare
Great Connell, Newbridge, Co. Kildare
Granted 26 Sep 2023 (final grant issued 26 Nov 2023)
We no longer update this application, so we can't email you about it. Get new planning applications in Newbridge by email
Key facts
- Planning application 2360087 at Great Connell, Newbridge, Co. Kildare: New 2-storey extensions to the south-west.
- It was received by Kildare County Council on 2 Aug 2023.
- Status: Granted 26 Sep 2023 (final grant issued 26 Nov 2023).
Source: the Kildare County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Newbridge · Planning applications in Co. Kildare
Council register
The council's register shows: Granted on 26 Sep 2023.
Search the Kildare planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
New 2-storey extensions to the south-west
(a) The construction of new 2-storey extensions to the south-west (extension 1—proposed floor area of 81.9 m²) and north-east (extension 2—proposed floor area of 106.6 m²) ends of the existing 2-storey offices to the rear of the existing fabrication workshop to provide additional office and ancillary accommodation. (b) The construction of an internal pedestrian walkway link at first floor level (proposed floor area of 45.8 m²) within the existing fabrication workshop to connect the existing offices to the rear to the existing offices to the front that face the Newbridge South Orbital Relief Road (NSORR). (c) Modifications to the existing fabrication workshop & rear offices to include: • Replacement of all existing external windows & doors in the existing rear offices with new windows & doors. • Widening of some existing window openings in the existing rear offices to facilitate larger window openings. • Replacement of existing external wall finishes of the existing rear offices—forticrete blockwork at ground floor level and profiled metal cladding at first floor level—with new insulated cladding panels. • Amendments to the north-east elevation of the existing fabrication workshop to include new insulated cladding panels and new windows and doors. • Internal modifications to the existing rear offices and fabrication workshop to facilitate the proposed extension works and connection of the proposed internal pedestrian walkway link between the front and rear offices. (d) The provision of 5 additional car parking spaces to serve the proposed extension works. (e) The provision of 5 additional bicycle parking spaces to serve the proposed extension works. (f) The connection to existing services on site—i.e. connection into existing foul, surface water, & water main networks serving the existing building. (g) All associated ancillary site development works. Please note all other planning items relating to the overall Murphy International headquarters and site are to be completed as per details agreed under previously approved planning permission register reference no.: 21/1780. Development works agreed under this previous grant of permission are ongoing.
- Location
- Newbridge, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 2360087
Numbers and dates
- Floor area
- 234 m²
- Project type
- Commercial new build
- Received
- 2 Aug 2023
- Decision to grant
- 26 Sep 2023
- Final grant
- 26 Nov 2023
- Site start notified
- 19 Jun 2024
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Site history
This site's history
-
Application 2661150 at the same address: received 16 Oct 2026, no decision recorded yet.
the construction of a single storey dwelling with a floor area of 162 square metres, with an existing agricultural entrance, the provision… Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2360087 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kildare County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 19 Jun 2024Notice filed · (a) Rear office extension and upgrade works and (b) conversion of front atrium to new...View the site start
- Completion certificate recordedRecorded in Jun 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area