Infrastructure · Co. Kildare

Kilrainy and Kilrathmurry Townlands, Clonard, Co. Kildare

Granted 13 Feb 2024

What and where

1. Quarry development and associated processing previously permitted…

1. Quarry development and associated processing previously permitted under P. Reg. Ref. No. 99/2042 and ABP Ref. PL09.123207) to include drilling, blasting, crushing and screening of rock; and lateral extension to same, with an overall extraction area of c. 6.2 hectares with no vertical deepening below the existing quarry floor. The appropriate period of planning register reference 99/2042 was extended by order dated 03/02/2017 by P. Reg. Ref. No. 16/1246; 2. Importation of up to 35,000 tonnes per annum of processed fine aggregate, principally sand for use in readymix concrete production on site; 3. Use of buildings and structures associated with the sand and gravel pit previously granted planning permission under P. Reg. Ref. No. 03/2754 comprising of the crushing, washing and screening plant with associated silt disposal lagoons; readymix concrete batching plant including powerhouse; prefabricated office; weighbridge; workshop building with concrete laboratory and bunded fuel tanks; aggregate storage bays; and one liquid effluent treatment system unit; 4. Closure of the existing site entrance with provision of a new site entrance located to the north of the existing entrance; realignment of the main internal site access road from the new site entrance to the central processing area with provision of a new wheelwash system; acoustic fence screening (c.2m in height x 170m in length); and a new screening berm along the western site boundary; 5. Restoration of the site lands will be to a combination of beneficial agricultural and ecological after-uses; 6. All associated site works within an overall application area of c. 51.7 hectares. The proposed operational period is for 10 years plus 2 years to complete restoration (total duration sought 12 years); and 7. Provision is also made for 3 no. sections of road improvements (widening) along the haul route between the site entrance and the R148 regional road. The proposals at the identified locations include for works in the public road and verge that aim to achieve a consistent carriageway width of 6.0m along with provision of verge widening on the inside of the three bends to improve forward visibility and intervisibility for all opposed traffic including traffic generated by the proposed development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this planning application

Location
Clonard, Co. Kildare Map
Planning reference
2360266

Key facts

Project type
Infrastructure
Received
2 Oct 2023
Granted
13 Feb 2024

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 13 Feb 2024 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2360266 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Kildare County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Clonard

Get alerts for ClonardFree. We email you when new applications appear.

Free email alerts

Get new Clonard projects by email

New planning applications, decisions and site starts in Clonard, Co. Kildare. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options