Large residential · Co. Kildare
“Leixlip Gate” in the townlands of Kilmacredock Upper and Castletown, Leixlip, Co Kildare
Granted on appeal 17 Jul 2024 (Granted 5 Apr 2024 by the council)
We no longer update this application, so we can't email you about it. Get new planning applications in Leixlip by email
Key facts
- Planning application 2360485 at “Leixlip Gate” In The Townlands of Kilmacredock Upper and Castletown, Leixlip, Co Kildare: Large Scale Residential Development.
- The applicant is Cairn Homes Properties Limited.
- It was received by Kildare County Council on 14 Dec 2023.
- Status: Granted on appeal 17 Jul 2024 (Granted 5 Apr 2024 by the council).
Source: the Kildare County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Leixlip · Planning applications in Co. Kildare
Council register
The council's register shows: Granted on 5 Apr 2024.
Search the Kildare planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Large Scale Residential Development
a Large Scale Residential Development (LRD) at this site of c.8.6ha at “Leixlip Gate”, in the townlands of Kilmacredock Upper and Castletown, Leixlip, Co Kildare. The site is located to the east of the R449, north of the M4, and south of the “Harpur Lane” residential and creche development currently under construction (Reg. Ref. ABP-307223-20, and as amended by KCC Reg Ref.22/1226 and Reg. Ref. 23/606). The development will consist of: Construction of 229 no. dwellings comprising: 139 no. 2-storey houses comprising 10 no. 2-bed, 119 no. 3-bed and 10 no. 4-bed units; 54 no. apartments within 1 no. 5-storey block comprising 25 no. 1-bed and 29 no. 2-bed units; 36 no. duplex units within 3 no. 3-storey blocks comprising 18 no. 2-bed and 18 no. 3 bed units; All with associated private gardens/ balconies/ terraces to the north/south/east/west elevations. 255 no. car parking spaces (including e-charging points) and 250 no. secure bike parking spaces (with residential spaces located within dedicated bicycle stores). Vehicular accesses to the development via the Harpur Lane development to the north with pedestrian/cyclist access via Harpur Lane and the R449 to the west. This includes a second access to Harpur Lane provided via the creation of a second permanent opening in the existing boundary demesne wall. Minor amendments to the permitted Harpur Lane development (Ref. ABP-307223-20) to provide the proposed accesses/connections and for connections to services. Provision of new open spaces and landscaped areas including a new public park to the south and west of the site. All associated site development works (including reprofiling of the land), boundary treatments, acoustic fencing (along the boundary with the R449 and M4 slip road), bin stores, ESB substations, public lighting; site services, drainage works and all associated infrastructure. Temporary permission (3 years) is also sought for the erection of an advertising signage adjacent to the R449 (total area c.9.29 sq.m).
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Leixlip, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 2360485
- Applicant
- Cairn Homes Properties Limited
Numbers and dates
- Project type
- Large residential
- Received
- 14 Dec 2023
- Council decision
- 5 Apr 2024
- Appeal lodged
- 26 Apr 2024
- Granted on appeal
- 17 Jul 2024
- Site start notified
- 16 Sep 2024
Timeline
- Application received
- Granted by the council
- Appeal lodged
- Appeal decidedGrant permission with revised conditions
- Site start notified
Site history
This site's history
-
Earlier permission 221226 for this site: granted 7 Dec 2022.
for development at a site "Leixlip Gate (south)", Kilmacredock, Leixlip. Co Kildare. The site is located to the south of "Harpur Lane"… Named in this application's description -
Earlier permission 23606 for this site: granted 24 Jul 2023.
the expansion of a previously approved creche/preschool facility to incorporate the previously approved gym in SHD Ref No ABP307223-20 at… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2360485 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealGrant permission with revised conditions · 319625 / 17 Jul 2024View the appeal record
- From the planning documentsRead from Planning Report in the council's file.
- Unit mix
- 25 1-bed apartment, 10 2-bed house, 18 2-bed duplex, 29 2-bed apartment, 119 3-bed house, 18 3-bed duplex, 10 4-bed house
- Site area
- 8.6 ha
- Applicant in the planning documents
- Cairn Homes Properties Limited
- Phasing
- Second phase of development, delivering final area of the KDA.
- Scope
- Construction of 229 dwellings, car and bike parking, accesses, open spaces, landscaping, and associated infrastructure on a greenfield site.
How we know this
From the Kildare County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 16 Sep 2024Notice filed · phase 1 · Construction of a 3-storey duplex building (Block 2)comprising 6 no. 3-bed, 2-storey...View the site start
- 16 Sep 2024Notice filed · phase 2 · Construction of a 3-storey duplex building (Block 3) comprising 6 no. 3-bed 2-storey...View the site start
- 16 Sep 2024Notice filed · phase 3 · Construction of Block A, 5-storey Apartment block comprising 25 1-bed and 29 2-bed unitsView the site start
- 23 Sep 2024Notice filed · phase 4 · Construction of 137 2-storey dwelling unitsView the site start
- 25 Aug 2025Notice filed · phase 5 · Construction of single storey ESB Substation & Switchroom and associated works.View the site start
- Completion certificate recordedRecorded in Sep 2024 · 12 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Sep 2024 · 4 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Sep 2024 · 6 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area