Development Description
a new 38kV electricity circuit between the existing Kildare ESB substation and the existing Newbridge ESB substation County Kildare. The circuit will be c. 8.5km in length and will consist of c. 7km of overhead line (OHL) and c. 1.5km of underground cable (UGC). The OHL structures (48 No.) will consist of single and double wood polesets, with a height above ground level ranging from c. 9.7m to c. 18m and will require below ground foundations and staywires at specific locations. The UGC will primarily run along public roads and will consist of electrical cables laid in underground ducts buried in a trench (with varying dimensions between c.0.6m and c. 0.9m width and a depth of c.1.2m). Permission is sought for all associated works including temporary works such as the creation of access ways and ancillary temporary and permanent works. Revised by Significant further information which consists of Natura Impact Statement (NIS)