Large residential · Co. Kildare
“Harpur Lane” (Leixlip Gate), in the townlands of Kilmacredock Upper and Castletown, Leixlip Co Kildare
Granted 19 Mar 2024 (final grant issued 29 Apr 2024)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Kildare by email
Key facts
- Planning application 2460055 at “Harpur Lane” (Leixlip Gate), In The Townlands of Kilmacredock Upper and Castletown, Leixlip Co Kildare: Large-Scale Residential Development.
- The applicant is Cairn Homes Properties Limited.
- It was received by Kildare County Council on 29 Jan 2024.
- Status: Granted 19 Mar 2024 (final grant issued 29 Apr 2024).
- Work was due to start on 16 Sep 2024, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Kildare County Council planning register, as last seen on 2 Jun 2026. Open the council's file
Council register
The council's register shows: Granted on 19 Mar 2024.
Search the Kildare planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Large-Scale Residential Development
for a Large-Scale Residential Development at a site is located to the east of the R449, north of the M4, and west of Leixlip Gate Road. It is in the southeast area of the permitted Strategic Housing Development “Harpur Lane”, Leixlip Gate, Kilmacredock, Leixlip currently under construction (Reg. Ref. ABP-307223-20). The development will consist of amendments to the permitted development Reg. Ref. ABP-307223-20 as follows: - Alterations to duplex block B to amalgamate the two permitted blocks into one single block to provide 12 no. units (6 no. 2-beds and 6 no. 3-beds). No change to the number of units. - Alteration to block C to provide 4 additional units resulting in 12 no. units (6 no. 2-beds and 6 no. 3-beds). Alteration to open space areas to provide c. 488 m² of communal open space and c.820 m² of public open space. Provision of 2 no. additional car parking spaces and 4 no. additional cycle parking spaces. Alteration to the external elevations and relocation of the bicycle and bin stores. The proposed amendment will increase the number of units to 24 (from 20 no. duplex units) with associated private balconies/terraces to the north/south/east/west elevations. The application includes for all site services required to facilitate the amendment to Blocks B & C. The proposed alterations will result in an increase of the total number of residential units in the Harpur Lane development to 243 no. residential units, 395 car parking spaces and 212 cycle parking spaces. The remainder of the site, as permitted by Reg. Ref. ABP-307223-20, will remain unchanged
Description as published by the council. Its text starts part-way through a sentence.
- Location
- “harpur Lane” (leixlip Gate), Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 2460055
- Applicant
- Cairn Homes Properties Limited
Numbers and dates
- Project type
- Large residential
- Received
- 29 Jan 2024
- Decision to grant
- 19 Mar 2024
- Final grant
- 29 Apr 2024
- Site start notified
- 16 Sep 2024
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460055 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Planning Report in the council's file.
- Unit mix
- 29 1 Bed, 77 2 Bed, 131 3 Bed, 6 4 Bed
- Site area
- 0.03542 ha
- Applicant in the planning documents
- Cairn Homes Properties Limited
- Phasing
- Single phase amendment to permitted SHD under construction
- Scope
- Amendment to duplex blocks B and C at Leixlip Gate, increasing total units from 20 to 24, with alterations to open space, parking, and elevations.
How we know this
From the Kildare County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 16 Sep 2024Notice filed · phase 1 · Construction of 3- storey building (Block C) comprising 6no. 3-bed, 2-storey duplex over...View the site start
- 16 Sep 2024Notice filed · phase 2 · Construction of a 3-storey building (Block B) comprising 6 no. 3-bed, 2-storey duplex...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area