Telecoms · Co. Kildare
38 kV / MV electrical substation, Co. Kildare
Granted 16 May 2024
Key facts
- Planning application 2460253 at Co. Kildare: 38 kV / MV electrical substation.
- It was received by Kildare County Council on 25 Mar 2024.
- Status: Granted 16 May 2024.
- Permission was granted on 16 May 2024 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Kildare County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
What and where
38 kV / MV electrical substation
The development will consist of a 38 kV / MV electrical substation, underground cables and associated works. The development will include the following elements - see site notice for full description due to limited characters here. 1)Construction of a substation compound of approximately 2,850 m² gross area, with 2.6 m high palisade fence around the entire perimeter of the substation, with the following electrical plant within the substation: 1 No. prefabricated 38 kV GIS module and foundation (c.31 m² and c.5.2 m high); 1 No. prefabricated MV GIS module and foundation (c.32 m² and c.4.7 m high); 1 No. prefabricated Control Room module and foundation (c.32 m² and c.4.7 m high); 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.15 m², c.4.5 m high ea.); Telecommunication SCADA pole of c.10 metres in height; Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; Internal access road of c.40 m in length and c.5m wide within the proposed substation; Compound lighting, boundary treatment, associated drainage, landscaping and all ancillary site development works; 2)Use of a portion of the existing temporary road (c.200 m in length) permitted as part of the recent MSD Rathgall development (Planning Ref: 21/360 & 22/110) for permanent use to facilitate access to the proposed substation; 3)Construction of new stone wall, fencing and gates at the existing junction of the temporary road with the public road; 4)Construction of an internal access road (c.140 m in length) to the proposed substation extending from the existing temporary road on the MSD lands to the proposed substation; 5)Site clearance works related to the proposed substation compound and access road; 6)Installation of c.1.3 kilometres of double-circuit 38 kV underground cables (UGC) along the R448 road between the proposed substation and the existing Carlow – Graigue 38 kV OHL; 7)Installation of c.0.7 kilometres of single circuit 38 kV UGC along the R448 road between the proposed substation and the existing Carlow – Ballylinan 38 kV OHL; 8)Installation of c.0.3 kilometres of six circuit MV UGC along the R448 road between the proposed substation and the existing R448 roundabout; 9)Installation of a new 12 m high steel lattice mast on the existing Carlow – Graigue 38 kV OHL; 10)Replacement of an existing timber poleset (IMP 1395) with a new 15 m high steel lattice mast on the existing Carlow – Ballylinan 38 kV OHL - this applicatio
- Location
- Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 2460253
Numbers and dates
- Floor area
- 2,850 m²
- Project type
- Telecoms
- Received
- 25 Mar 2024
- Granted
- 16 May 2024
Timeline
- Application received
- Granted
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460253 on eplanning.ie: drawings, reports and the decision.Open the council's file