Save this project to account

Infrastructure · Co. Kildare

within the townlands of Droichead Nua (Newbridge), and Old Connell Naas Road, Newbridge, Co. Kildare

Granted 28 Nov 2024

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 11 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

Development on this 3.3 ha site

development on this 3.3 ha site (phase 2 of a 2 phase residential development for some 126 no. dwellings on a wide site area of c.4ha) - A) The construction of 86 no. residential dwellings comprising: 45 no. houses (24 no. 3 bedroom dwellings [2 storey] and 21 no. 4 bedroom houses [3 storey]) and 41 no. apartments/duplex apartments in 2 no. 3 storey buildings (comprising 9 no. 1-bedroom, 6 no. 2-bedroom and 6 no. 3-bedroom units) as well as 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 10 locations throughout the site (with all apartments/duplex units to include balcony or terrace/private amenity space); B) Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways; C) The provision of 120 no. surface resident car parking spaces as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths; D) Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting; E) Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites)

Location
Newbridge, Co. Kildare Map
Planning reference
2460438

Key facts

Floor area
6,031 m²
Project type
Infrastructure
Received
17 May 2024
Granted
28 Nov 2024

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 28 Nov 2024 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2460438 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Kildare County Council planning register, as last seen on 11 Jun 2026. The council's own file is the official record.

Explore the area

More planning activity near Newbridge

Get alerts for NewbridgeFree. We email you when new applications appear.

Free email alerts

Get new Newbridge projects by email

New planning applications, decisions and site starts in Newbridge, Co. Kildare. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options