Temporary/event · Co. Kildare

Works associated with the proposed uprate of the existing 110 kV…, Co. Kildare

Granted 2 Sep 2025

Key facts

  • Planning application 2560302 at Co. Kildare: Works associated with the proposed uprate of the existing 110 kV…
  • It was received by Kildare County Council on 24 Mar 2025.
  • Status: Granted 2 Sep 2025.
  • Permission was granted on 2 Sep 2025 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Kildare County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Kildare

What and where

Works associated with the proposed uprate of the existing 110 kV…

for works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly and the existing Portlaoise 110 kV substation in the townlands of Clonminam and Kylekiproe, Co. Laois. The Cushaling – Portlaoise 110 kV OHL is approximately 41.6 km long and comprises 17 no. steel lattice tower structures and 193 no. wooden pole structures. The existing circuit is located across the functional areas of Offaly County Council (OCC), Kildare County Council (KCC) and Laois County Council (LCC). Approximately 10 km of the existing OHL circuit is located within the functional area of OCC, approximately 9 km is within the functional area of KCC and approximately 22.6 km is located within the functional area of LCC. Separate planning applications are being lodged with each respective County Council. The Proposed Development across the functional area of Co. Kildare is located in the townlands of Coolelan, Kiltaghan North, Kiltaghan South, Clonmoyle West, Ummeras More, Mountrice, Mullaghroe Upper, Mullaghroe Lower, Coolatogher, Coolsickin or Quinsborough and Coolnafearagh. The Proposed Development works across the functional area of Co. Kildare will comprise: 1. The replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor including installation of a new fibre communication connection; 2. The replacement of 2 no. steel towers and their foundations; 3. The replacement of steel members at 1 no. tower; 4. Full tower painting required at 1 no. location; 5. Shear block remedial works (raise and cap) at 1 no. tower location; 6. The replacement of wooden poles only at 8 no. locations; 7. The replacement of wooden poles and crossarm at 3 no. locations; 8. The replacement of crossarm only at 4 no. locations; 9. The replacement of existing danger notices at various locations, as required; 10. The replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations, as required; 11. The replacement of suspension clamps, vibration dampers and compression assemblies at all locations, as required; 12. All associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing; and 13. Other temporary associated

Description as published by the council. Its text starts part-way through a sentence.

Location
Co. Kildare Map
Planning reference
2560302
Council planning fileGet alertsDownload PDF

Numbers and dates

Project type
Temporary/event
Received
24 Mar 2025
Granted
2 Sep 2025

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 2 Sep 2025 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560302 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Kildare County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Co. Kildare

Get alerts for Co. KildareFree. We email you when new applications appear.

Free email alerts

Get new Kildare projects by email

New applications, decisions and site starts in Co. Kildare. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options