~39 dwellings, Cowanstown Kealstown Bryanstown Dowdstown, Donaghstown...
for the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
No near-term procurement timing is inferred from a refused planning decision.
REFUSED / Confidence: High for planning stateDecision recorded 22 May 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII...
Named firms
Public source roles
- Windgates Solar Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kildare County Council
- Exact reference
- 2560326
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Appeal/FI - 39 dwellings
The public application record identifies 39 dwellings in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Windgates Solar Ltd
- Planning agent
- Anna D'Arcy
- Agent address
- Ground Floor, Unit 3 Bracken Business Park, Bracken Road Sandyford, Dublin 18 D18 V32Y
More Kildare planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works
Application to site progress
-
Applied 28 Mar 2025 2560326
-
Decision Refused 22 May 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed This planning record has no linked public commencement evidence.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560326
for the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works
Open official record