Appeal/FI, Kilberry Bog, Loughabor, Athy
for the erection of a guyed wind monitoring mast 120m in height, with instruments, and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for wind farm development. Revised by Significant further...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 17 Apr 2026. / Confidence: LowDecision date 17 Apr 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for the erection of a guyed wind monitoring mast 120m in height, with instruments, and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for wind farm development. Revised by Significant further information which consists of an auxiliary power system including wind charger 5 metres in height, underground cabling 12 metres in length, solar array and battery enclosure
Named firms
Public source roles
- Kilberry Wind Farm DAC
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kildare County Council
- Exact reference
- 2560354
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Appeal/FI
The public application record identifies appeal/fi in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Kilberry Wind Farm DAC
- Planning agent
- Ronan Mahon
- Agent address
- Bord na Móna Main St., Newbridge Co. Kildare W12 XR59
More Kildare planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for the erection of a guyed wind monitoring mast 120m in height, with instruments, and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for wind farm development. Revised by Significant further information which consists of an auxiliary power system including wind charger 5 metres in height, underground cabling 12 metres in length, solar array and battery enclosure
Application to site progress
-
Applied 4 Apr 2025 2560354
-
Decision Conditional 17 Apr 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560354
for the erection of a guyed wind monitoring mast 120m in height, with instruments, and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for wind farm development. Revised by Significant further information which consists of an auxiliary power system including wind charger 5 metres in height, underground cabling 12 metres in length, solar array and battery enclosure
Open official record