Development Description
for A. Retention of garden house foundation and partially erected timber frame walls and completion of construction of the garden house to the rear of the existing property B. Replacement of the existing substandard septic tank with a new wastewater and percolation area. Revised by Significant Further Information which consists of: Retention Permission is also sought for two temporary structures on the landholding for a temporary time period of max 1 year. The temporary structures comprise: (a) Container 12mx2.4m, use bicycle & material storage for the proposed Garden House construction. (b) Canopy 6mx3m; material storage for the proposed Garden House construction
Map
No coordinates supplied in the public planning feed.