Commercial new build · Co. Kildare

Grangeford, Castledermot, Co. Kildare

Granted 10 Jul 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 15 Sep 2026. The details below are as they were then. The council's register has the current status.

What and where

Covered loading area in place of permitted floorspace in storage of…

Provision of covered loading area in place of permitted floorspace in storage of raw materials building. Planning permission is sought to complete the development of the covered loading area. The overall size of the raw materials building has been reduced to c. 1000 sq.m; Reduction in height of previously permitted extension to office/ packing building by 3.4m and elevational changes; Amended layout and design to previously permitted office and an increase in floorspace of c. 11.4 sq.m. There will be an increase over the permitted building height of 0.84m. Increase in size of previously permitted storage of finished product/ packaging building of c. 21 sq.m. There will be a reduction in building height of 2.5m; Elevational changes to previously permitted barrel/ IBC storage building; Reduction in size of previously permitted extension to the processing shed of c. 113 sq.m, internal reconfiguration and associated elevational changes. Provision of a weighbridge; Provision of a bund adjacent to the prefill building; Relocation of 1 no. previously permitted sliding gate; Installation of 1 no. additional sliding gate; Provision of 8 no. carparking spaces including 5 no. EV spaces; Amendments to permitted hard and soft landscaping areas and additional landscaping, including for extended concrete yard area. Elevational changes to the packing, airlock, and storage of raw materials buildings; 2 no. sliding gates that were previously permitted as opening gates (1 in a relocated position).

Location
Castledermot, Co. Kildare Map
Planning reference
2660046
Applicant
Natures Oils Ltd/ Goldstar Oils Ltd and Bolton Biofuels Ltd

Key facts

Floor area
1,145 m²
Indicative value
€1m–3mPlanningBrief estimate
Project type
Commercial new build
Received
19 Jan 2026
Granted
10 Jul 2026

Timeline

  1. Application received
  2. Further information requested
  3. Granted

Outlook

What happens next

Permission was granted on 10 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660046 on eplanning.ie: drawings, reports and the decision.Open the council's file

Reviewed build intelligence

What the documents establish

Government document review

Final permission dated 17 August amends the partly implemented parent 17/813, extended by 23/836. This is remaining and altered industrial work within the parent site, not a wholly new plant.

4 official documents inspected · Checked 2026-09-07 · Official file index

Final grant covers revisions and completion of the partly built plant

Final amendment permission within the existing industrial project

What the evidence says
The 17 August grant describes retention of as-built elevations and gates, completion of a covered loading area, altered heights and floor areas, a weighbridge, bund and yard changes. Condition 4 carries forward the parent 17/813, extended by 23/836, including its expiry.

Why it may matter — interpretation
Envelope and yard contractors should establish the remaining package against the parent works and avoid treating every described building as new supply.

What is not established
A present-day site inspection, independently matched commencement and completed revised works were not reviewed.

Inspect the evidence

Final grant and renumbered conditions · p.2
Final grant 17/08/2026; amendments and retention · Issued 2026-08-17 · Final grant; retains boilerplate reference to 19 conditions but schedule is renumbered following removal of the original contribution condition · Checked 2026-09-07

Final grant 17/08/2026; amendments and retention

Final grant and renumbered conditions · p.3
Condition 4: 17/813 as extended by 23/836 · Issued 2026-08-17 · Final grant; retains boilerplate reference to 19 conditions but schedule is renumbered following removal of the original contribution condition · Checked 2026-09-07

Condition 4: 17/813 as extended by 23/836

The FI drawing identifies paused work and unfinished building areas

Applicant-reported construction status in the FI drawing

What the evidence says
The construction-status drawing distinguishes completed production, storage and airlock areas from blue areas still to be constructed or revised. It reports paused works at buildings 4 to 7, an unstarted processing-shed extension at building 9, and building 8 still to be completed subject to elevation alterations. These are statements in the June-submitted drawing.

Why it may matter — interpretation
Steelwork, cladding and industrial-door enquiries can focus on the unfinished or revised areas rather than assume the whole plant remains unbuilt.

What is not established
Progress after the June submission, contractor appointments and unplaced orders are not established.

Inspect the evidence

Site layout showing construction status · p.1
Building status callouts; areas to be constructed and subject to revisions · Issued 2026-04-15 · J437-PLN-01-04 revision 01 RFI; received 17 June · Checked 2026-09-07

Building status callouts; areas to be constructed and subject to revisions

The yard drainage proposal needs an agreed implementation design

Granted SuDS strategy with further detailed agreement required

What the evidence says
The FI SuDS drawing routes runoff from the extended concrete yard through a grass swale to a proposed soakaway, with a controlled high-level outlet. Final-grant condition 12 requires an agreed implementation report and maintenance plan, including the 1-in-100-year event, 30% climate allowance and 10% urban creep.

Why it may matter — interpretation
Civil and landscape teams need to coordinate yard falls, swale inlets, storage and maintenance access before construction.

What is not established
Written acceptance of the implementation design, final hydraulic sizing and installed drainage performance are not established.

Inspect the evidence

SuDS site layout · p.1
Swale, flow control and proposed soakaway · Issued 2026-04-15 · J437-PLN-03 revision 01 RFI; received 17 June · Checked 2026-09-07

Swale, flow control and proposed soakaway

Final grant and renumbered conditions · p.5
Condition 12: implementation report and maintenance plan · Issued 2026-08-17 · Final grant; retains boilerplate reference to 19 conditions but schedule is renumbered following removal of the original contribution condition · Checked 2026-09-07

Condition 12: implementation report and maintenance plan

The original additional contribution was removed before final grant

July correction reflected in the August final schedule

What the evidence says
Order DO67020 removes original decision condition 2. The accompanying 29 July memorandum explains that overall floor area reduced against parent 17/813 and that the parent contribution had been paid; the additional calculation should therefore be nil. The final schedule renumbers the subsequent conditions.

Why it may matter — interpretation
Commercial review should use the operative amended schedule, including its renumbered civil and environmental conditions.

What is not established
This finding does not establish satisfaction of other compliance conditions or authorise additional scope.

Inspect the evidence

Order DO67020 removing the original contribution condition · p.1
Order removes condition no. 2 · Issued July 2026 (month only) · Signed order with memorandum dated 29 July 2026; handwritten order date 30 July · Checked 2026-09-07

Order removes condition no. 2

Order DO67020 removing the original contribution condition · p.2
Reduction in overall square metres; contribution calculation should be NIL · Issued July 2026 (month only) · Signed order with memorandum dated 29 July 2026; handwritten order date 30 July · Checked 2026-09-07

Reduction in overall square metres; contribution calculation should be NIL

Final grant and renumbered conditions · p.3
Condition 2 now concerns the revised site layout · Issued 2026-08-17 · Final grant; retains boilerplate reference to 19 conditions but schedule is renumbered following removal of the original contribution condition · Checked 2026-09-07

Condition 2 now concerns the revised site layout
Remaining document questions
  • Have the detailed SuDS implementation and landscape plans been agreed, and what work remains on site?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

How we know this

From the Kildare County Council planning register, as last seen on 15 Sep 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Castledermot

Get alerts for CastledermotFree. We email you when new applications appear.

Free email alerts

Get new Castledermot projects by email

New planning applications, decisions and site starts in Castledermot, Co. Kildare. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options