Development Description
the upgrade of part of the existing production building to include the following (i) removal of part of the existing roof and wall cladding and associated structure (139m2) (ii) erection of new structure and cladding within the production building (139m2) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 16.85m and a maximum ridge height of 18.59m and all associated site development works