Infrastructure · Co. Kildare
Site 35 Rowan Tree Road, Momentum Logistics Park, Ladytown Naas, Co. Kildare
Granted 28 Apr 2026
Key facts
- Planning application 2660234 at Site 35 Rowan Tree Road, Momentum Logistics Park, Ladytown Naas, Co. Kildare: 1 no. warehousing/industrial/logistics building.
- The applicant is Green Urban Logistics Development Corporation Ltd. The agent is Brock McClure Planning & Dev Consultants.
- It was received by Kildare County Council on 4 Mar 2026.
- Status: Granted 28 Apr 2026.
- Work was due to start on 22 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Kildare County Council planning register, checked 2 Jun 2026. Open the council's file
More planning applications in Ladytown Naas · Planning applications in Co. Kildare
What and where
1 no. warehousing/industrial/logistics building
for • The construction of 1 no. warehousing/industrial/logistics building (approx. 11,901 m² total GFA and 16.37m in height) including ancillary office space, reception area, lobby, circulation areas, plant, tea stations, stores, a gym, a canteen, meeting rooms, comms room, WCs and shower facilities; • The provision of 37 no. dock levellers and 6 no. doors on grade for loading and unloading of Heavy Goods Vehicles; • The provision of 114 no. trailer parking spaces; • The provision of a Double Deck Drive Thru with canopy structure for level loading; • The provision of 82 no. car parking spaces (including 7 no. EV parking spaces and 5 no. accessible parking spaces), 4 no. motorbike parking spaces and 56 no. secure bicycle parking spaces; • 3 no. new vehicular access / egress points are proposed in the form of 2 no. HGV access / egress points via Rowan Tree Road and 1 no. vehicular access point to the serve staff car parking areas separately via Rowan Tree Road; • 1 no. bin store (approx. 32 m²) and 1 no. recycling store (approx. 18 m²) (approx. 50 m² total GFA); • 1 no. ESB Substation located along Rowan Tree Road; • 1 no. Sprinkler Tank and 1 no. Pump House associated with the proposed warehousing unit; • 1 no. LPG Tank; • An attenuation basin located at the north-western boundary of the site; • Extension of pedestrian and cycling facilities along Rowan Tree Road previously permitted under Reg. Ref. 23516; • 3 no. signage areas on the north-eastern, south-western and south-eastern elevations of the proposed unit (approx. 2.135m x 7.240m each) • PV solar panels at roof level; • Security Fencing (approx. 2.4m in height) surrounding the Service Yard on the south-western boundary, and north-western boundary and to include new security fence & sliding gates to the 2no HGV access / egress points on the south-eastern elevation. • All associated site development works including lighting, external plant, landscaping and engineering works.
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Ladytown Naas, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 2660234
Numbers and dates
- Homes
- ~1estimated from the application
- Floor area
- 12,001 m²
- Project type
- Infrastructure
- Received
- 4 Mar 2026
- Granted
- 28 Apr 2026
- Site start notified
- 22 Sep 2026
Timeline
- Application received
- Granted
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660234 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kildare County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Site starts
Commencement notices for this permission
- 22 Sep 2026Notice filed · phase 1 · Construction of Unit 35A Naas Enterprise Park, Newhall, Naas, Co. Kildare, comprising a...View the site start
- 2 Oct 2026Notice filed · phase 2 · Construction of a sprinkler pumphouse at Unit 3 1 Rowan Tree Road Naas Enterprise Park.View the site start
- 6 Oct 2026Notice filed · phase 3 · Construction of ESB Sub-station (for Site 35A) at Unit 3, Rowantree Road, Momentum...View the site start