What and where

Replacement

Replacement (“restringing”) and uprating of c.8.89km section of the conductor along the existing Athy - Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 11No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result in standardised heights from 16m to 24m, with height increases between 1m and 3m; - Replacement of 12No. existing intermediate Wooden Polesets crossarms; - Recapping works on shear blocks at 1No. existing steel angle mast; - Foundation strengthening of 1No. existing steel angle mast; - Bar member replacements to 8No. existing steel angle masts; - Separation of the existing double OHL circuit to provide for a new bypass OHL section measuring approximately 422m, connecting from the existing Athy 110 kV substation to the following proposed new structures on the existing Athy - Portlaoise 110 kV OHL: 2no. new single circuit angle masts (approximately 22.5m maximum height) and 1no. new wooden poleset (approximately 23.6m maximum height); and, - All associated works/development to existing structures, including hardware replacement (strain clamps, suspension clamps and vibration dampers), replacement of step bolts, replacement of line identification and danger notices, painting of angle masts, replacement/installation of anti-climbing guards, access tracks, vegetation clearance, temporary construction compounds and all other works necessary to facilitate the development

Location
Co. Kildare Map
Planning reference
2660550
Applicant
Eirgrid Plc
Agent
Jane Myers

Key facts

Project type
Energy
Received
26 May 2026
Granted
17 Jul 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 17 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660550 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Kildare County Council planning register, as last seen on 22 Sep 2026. The council's own file is the official record.

Explore the area

More planning activity near Co. Kildare

Get alerts for Co. KildareFree. We email you when new applications appear.

Free email alerts

Get new Kildare projects by email

New planning applications, decisions and site starts in Co. Kildare. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options