Infrastructure · Co. Kilkenny
Poulgour, Kilkenny City, Co. Kilkenny
Granted 14 Sep 2021 (final grant issued 15 Oct 2021)
We no longer update this application, so we can't email you about it. Get new planning applications in Kilkenny City by email
Key facts
- Planning application 21348 at Poulgour, Kilkenny City, Co. Kilkenny: Housing development.
- It was received by Kilkenny County Council on 28 Apr 2021.
- Status: Granted 14 Sep 2021 (final grant issued 15 Oct 2021).
Source: the Kilkenny County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Kilkenny City · Planning applications in Co. Kilkenny
Council register
The council's register shows: Granted on 14 Sep 2021.
Search the Kilkenny planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Housing development
for a housing development on a site of c. 3.2 ha. The development will consist of: Construction of 77 no. residential units including 4 no. four bed houses, 34 no. three bed houses, 4 no. 2 bed duplex houses, 8 no. 3 bed duplex house, 9 no. one bed apartments, 12 no. two bed apartments and 6 no. three bed apartments: Building Type F is a 2-3 storey duplex building which comprises of 3 no. units, comprising of 2 no., 3 bedroom 5 person units and 1 no. 2 bedroom 4 person unit with a balcony at second floor level. The proposed apartment building comprises 27 no. units arranged over 5 no. storeys: Patios/terraces are provided on all elevations: The scheme provides for a total of c. 5.908 m² of public open space including 502 m² of communal open space. The foul sewer flows by gravity to the north west corner of the site. The foul water discharges to a proposed pumping station (Irish Water Ref Type II Pump station). The pumping station is designed to have a 24 hour emergency storage. The pumping station measures c. 14.5 x c.6m wide: Provision of 62 no. long term and 40 no. visitor bicycle parking spaces: The vehicular access to the site will be from the LIHAF Road: Provision of 76 no. on-curtilage car parking spaces and 64 no. on-street car parking spaces (140 no. car parking spaces in total): 2 temporary sales/marketing signposts are proposed (one located to the north of the site and one no. at a site adjacent to the Callan Road): A temporary sales & marketing suite along with flagpole signage is proposed to the south of the new entrance roadway. This will be served by two temporary car parking spaces: A new opening within the existing stone wall at White Bridge, to provide a new pedestrian connection to the site from White Bridge: All other ancillary site development works to facilitate construction, site services, piped infrastructure, plant, public lighting, bin stores, covered bicycle parking, new pedestrian and cycle routes, boundary treatments and hard and soft landscaping. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Kilkenny City, Co. Kilkenny Map
- Council
- Kilkenny County Council
- Planning reference
- 21348
Numbers and dates
- Project type
- Infrastructure
- Received
- 28 Apr 2021
- Decision to grant
- 14 Sep 2021
- Final grant
- 15 Oct 2021
- Site start notified
- 21 Dec 2021
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 21348 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Kilkenny County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 21 Dec 2021Notice filed · phase 1 · Phase 01 of a new Residential Development, at Poulgour, Kilkenny City, Co. Kilkenny...View the site start
- 10 Mar 2022Notice filed · phase 2 · Phase 02 of a new Residential Development, at ‘Castle Oaks’, Poulgour, Kilkenny City...View the site start
- 30 Sep 2022Notice filed · phase 3 · Phase 03 of a new Residential Development, at ‘Castle Oaks’, Poulgour, Kilkenny City...View the site start
- 18 Oct 2022Notice filed · phase 4 · Phase 05 of a new Residential DevelopmentView the site start
- 18 Oct 2022Notice filed · phase 5 · Phase 04 of a new Residential Development, at ‘Castle Oaks’, Poulgour, Kilkenny City...View the site start
- 3 Jan 2023Notice filed · phase 6 · Phase 06 of a new Residential Development, at ‘Castle Oaks’, Poulgour, Kilkenny City...View the site start
- Partial completion certificate recordedRecorded in Dec 2021 · 17 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Partial completion certificate recordedRecorded in Mar 2022 · 6 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Partial completion certificate recordedRecorded in Mar 2022 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area