Site start · Co. Kilkenny
Callan, Kilkenny
Site start 6 Jan 2025
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
Search the Kilkenny planning registerCurrent planning applications in Callan
What and where
19 homes
for the construction of 19 No. 2-storey semi-detached and terraced housing units, together with proposed boundary treatments, landscaping, and all associated site development works. The proposed road network and services to connect to existing residential development known as Friary Walk, (Planning permission ref.99-1809, 10-458, 16-186 & 20-189)
- Location
- Callan, Co. Kilkenny Map
- Council
- Kilkenny County Council
- Planning reference
- 2360516
- Applicant
- Andrew Glennon Developements Ltd
- Agent
- Andrew Glennon Developements Ltd
Key facts
- Homes
- 19
- Floor area
- 2,254 m²
- Indicative value
- €3m–10mPlanningBrief estimate
- Project type
- Small multi-unit
- Site start
- 6 Jan 2025
Documents and evidence
Check the record
- Council planning fileThe application file 2360516 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Phase 6 Engineering Planning Report in the council's file.
- Unit mix
- 8 4 Bedroom Semi Detached, 2 4 Bedroom Semi Detached, 4 3 Bedroom End-Terrace, 2 3 Bedroom Mid-Terrace, 1 3 Bedroom End-Terrace, 2 3 Bedroom Semi Detached
- Site area
- 0.7635 ha
- Applicant
- Andrew Glennon Developments Ltd
- Phasing
- Phase 6
- Scope
- Proposed residential development of 19 dwellings with associated infrastructure at Friary Walk, Callan, Co. Kilkenny.
- Rainwater
- “Surface water collected in 225mm pipes to existing attenuation pond”
- Wastewater
- “Foul drainage collected in 225mm uPVC network to existing pumping chamber”
How we know this
From the Kilkenny County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 6 Jan 2025Work started · The construction of 19 No. 2-storey semi-detached and terraced housing units, together...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area