Site start · Co. Kilkenny
Callan, Kilkenny
Granted 27 Aug 2024 (final grant issued 27 Sep 2024)
Key facts
- Site start record 2360516 at Callan, Co. Kilkenny: 19 homes.
- The planning authority is Kilkenny County Council.
- Status: Granted 27 Aug 2024 (final grant issued 27 Sep 2024).
Source: the Kilkenny County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Callan · Planning applications in Co. Kilkenny
Council register
The council's register shows: Granted on 27 Aug 2024.
Search the Kilkenny planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
19 homes
Commencement Notice for the construction of 19 No. 2-storey semi-detached and terraced housing units, together with proposed boundary treatments, landscaping, and all associated site development works. The proposed road network and services to connect to existing residential development known as Friary Walk, (Planning permission ref.99-1809, 10-458, 16-186 & 20-189)
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Callan, Co. Kilkenny Map
- Council
- Kilkenny County Council
- Planning reference
- 2360516
- Application type
- Commencement Notice
- Owner named on the notice
- Andrew Glennon Developements Ltd
- Agent named on the notice
- Andrew Glennon Developements Ltd
Numbers and dates
- Homes
- 19
- Floor area
- 2,254 m²
- Estimated construction value
- €3.4m to €4.4mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Small multi-unit
- Received
- 14 Nov 2023
- Decision to grant
- 27 Aug 2024
- Final grant
- 27 Sep 2024
- Site start notified
- 6 Jan 2025
Site history
This site's history
-
Earlier planning reference 10-458, named in this application's description: commencement notice filed for a start on 15 Aug 2016.
Named in this application's description -
Earlier planning reference 16186, named in this application's description: commencement notice filed for a start on 15 Aug 2016.
17 No. 2 storey semi-detached and terraced housing units together with proposed boundary treatments, landscaping and all associated site… Named in this application's description -
Earlier permission 20189 for this site: granted 7 Dec 2020, commencement notice filed for a start on 2 Jun 2021.
for construction of 41 No. 2 storey semi-detached and terraced housing units, 8 No. residential serviced sites together with proposed… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning fileThe application file 2360516 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Phase 6 Engineering Planning Report in the council's file.
- Unit mix
- 8 4 Bedroom Semi Detached, 2 4 Bedroom Semi Detached, 4 3 Bedroom End-Terrace, 2 3 Bedroom Mid-Terrace, 1 3 Bedroom End-Terrace, 2 3 Bedroom Semi Detached
- Site area
- 0.7635 ha
- Applicant in the planning documents
- Andrew Glennon Developments Ltd
- Phasing
- Phase 6
- Scope
- Proposed residential development of 19 dwellings with associated infrastructure at Friary Walk, Callan, Co. Kilkenny.
- Rainwater
- “Surface water collected in 225mm pipes to existing attenuation pond”
- Wastewater
- “Foul drainage collected in 225mm uPVC network to existing pumping chamber”
How we know this
From the Kilkenny County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 6 Jan 2025Notice filed · The construction of 19 No. 2-storey semi-detached and terraced housing units, together...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area