Development Description
for an upgrade to the existing Togher Crescent Wastewater Pumping Station, comprising; a new 5.2m3 below-ground water storage tank (2.1m in diameter x 2.4m deep); construction of a new access road from Togher Crescent; new 100mm diameter rising main within the R639; replacement of existing kiosk with two new kiosks (Kiosk 01 = 3.6m x 0.8m, 1.8m in height, Kiosk 02 = 2m x 1.2m, 1.8m in height) each set on concrete plinths 0.15m above ground level; a ground mounted solar PV array (26m2 total); and associated ancillary works including new landscaping, all on a site of 0.8ha.
Map
No coordinates supplied in the public planning feed.