What and where

Site is

The site is situated to the west of the Bohernatounish Road (and of existing buildings within the Business and Technology Park), to the east of the Outrath Road and Loughboy Industrial Estate, and to the south of the Kilkenny Ring Road(N10) and an existing office development. Permission is sought for the following development: • Expansion of the existing Central Utilities Building compound to facilitate construction of 38kV substation (as required by the ESB) to accommodate 2 no. electrical transformers, a single storey client switchroom building (with a parapet height of c.5.8m), and a single storey control room building (with a parapet height of c. 5.8m).• The control room building will accommodate a gas insulated switchgear room, control room, battery room, storeroom and WC. • The development includes all associated landscaping and ancillary works, services, protection masts, and boundary treatments. Retention permission is sought for the following alterations to the development permitted under Reg. Ref.: 22/662:• Amendments to the permitted industrial building including to the building footprint and the area of the ancillary office space and reception / dining areas (resulting in a decrease of c. 593 sq.m. in gross floor area (GFA) in total).• Associated amendments to the internal layout of the industrial building, to the building facades (including alterations to entrance / exit doors and fenestration), and roof plan (including rooflights), and the location of ancillary structures and landscaping in the vicinity of the ancillary office area, to reflect the altered building layout. • Relocation of one stair core along the northern building façade southward to sit within the massing of the building. • Construction of a of pump house, tanks for rainwater harvesting, smoking shelter, provision of a gabion wall around the outdoor dining area, omission of waste storage structure, relocation of pallet storage to the northeastern corner of the service yard, and relocation and alterations to permitted signage (including the omission of building signage on the southern elevation, provision of signage to the northern, western, and eastern elevation, campus and directional signage, and 3 no. flagpoles adjacent to the southern site entrance). • Amendments to the northern access point to the site, to remove the permitted vehicular access and provide for pedestrian and cycle access • Amendments to the Central Utilities Yard including relocation of 2 no. sprinkler

Location
Co. Kilkenny Map
Planning reference
2560075

Key facts

Floor area
593 m²
Indicative value
€500k–1mPlanningBrief estimate
Project type
Telecoms
Received
21 Feb 2025
Granted
17 Apr 2025
Site start
23 Jun 2025

Timeline

  1. Application received
  2. Granted
  3. Site start

Outlook

What happens next

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560075 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Kilkenny County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Site starts

Site starts and completion

  1. 23 Jun 2025Work started · Construction of a 38kV substation (as required by the ESB) a single storey client...
  2. Completion certificate recordedRecorded in Jun 2025 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Sep 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Co. Kilkenny

Get alerts for Co. KilkennyFree. We email you when new applications appear.

Free email alerts

Get new Kilkenny projects by email

New planning applications, decisions and site starts in Co. Kilkenny. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options