Small multi-unit · Co. Kilkenny

Road No. 8- Kiln LaneFriary Walk Clashacollare Callan Co. Kilkenny, Friary Walk, Clashacollare

Granted 8 Oct 2025 (final grant issued 10 Nov 2025)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560269 at Road No. 8- Kiln LaneFriary Walk Clashacollare Callan Co. Kilkenny, Friary Walk, Clashacollare: ~9 homes.
  • It was received by Kilkenny County Council on 16 May 2025.
  • Status: Granted 8 Oct 2025 (final grant issued 10 Nov 2025).
  • Work started on site on 29 Dec 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Kilkenny County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Kilkenny

What and where

~9 homes

for the construction of 9 No. 3-storey semi-detached and detached housing units, together with proposed boundary treatments, landscaping, and all associated site development works at Road No. 8- Kiln Lane, Friary Walk, Clashacollare, Callan, Co. Kilkenny. The proposed road network and services to connect to existing residential development known as Friary Walk, (Planning permission ref.99-1809, 10-458, 16-186 & 20-189).

Description as published by the council. Its text starts part-way through a sentence.

Location
Clashacollare, Co. Kilkenny Map
Planning reference
2560269
Council planning fileGet alerts

Numbers and dates

Homes
~9estimated from the application
Floor area
1,200 m²
Estimated construction value
€1.8m to €2.3mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Small multi-unit
Received
16 May 2025
Decision to grant
8 Oct 2025
Final grant
10 Nov 2025
Site start
29 Dec 2025

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start

Outlook

What happens next

Work started on site on 29 Dec 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • Heat pumpNamed in the planning documents
  • LandscapingNamed in the planning documents
  • GroundworksNamed in the planning documents
  • RainwaterNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560269 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from cover letter and design statement in the council's file.
    Unit mix
    9 3-storey semi-detached and detached housing units
    Phasing
    Phase 7
    Scope
    Construction of 9 three-storey semi-detached and detached housing units with boundary treatments, landscaping, and associated site development works.
    Heat pump
    “Air to water heat pump / underfloor heating to ground floor/aluminium radiators to the first floor”
    Landscaping
    “Comprehensive landscaping program with semi-mature specimen trees, park areas, and maintenance schedule”
    Groundworks
    “Road infrastructure and services already in situ; roads, drainage, utilities complete”
    Rainwater
    “Existing rainwater swale on adjoining lands with ground soak pits”
    Wastewater
    “Site serviced by public foul sewer with SUDS design approach for surface water control”
    Windows/doors
    “Minimum U Value Doors 1.40 (W/m²k) target, Windows 1.40 (W/m²k) target”
    Roofing
    “Minimum U Value Roof 0.16 (W/m²k) target”
    Cladding
    “Palette of quality materials: stone, tile, plaster render, brick”

How we know this

From the Kilkenny County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 29 Dec 2025Work started · 8 no. 3-storey Semi- detached Housing Units

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Clashacollare

Get alerts for Co. KilkennyFree. We email you when new applications appear.

Free email alerts

Get new Kilkenny projects by email

New applications, decisions and site starts in Co. Kilkenny. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options