Quarry · Co. Kilkenny

Kilree Sheastown, Bennettsbridge, Co. Kilkenny

Under appeal since 26 Aug 2026 (Decision to grant 30 Jul 2026 by the council)

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560532 at Kilree Sheastown, Bennettsbridge, Co. Kilkenny: Proposed development will take place within an overall application…
  • The applicant is Bennettsbridge Limestone Quarries Unlimited Company. The agent is Peter Kinghan.
  • It was received by Kilkenny County Council on 18 Aug 2025.
  • Status: Under appeal since 26 Aug 2026 (Decision to grant 30 Jul 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Kilkenny County Council planning register, checked 26 Aug 2026. Open the council's file

More planning applications in Bennettsbridge · Planning applications in Co. Kilkenny

What and where

Proposed development will take place within an overall application…

for The proposed development will take place within an overall application area of approximately 61 hectares and will consist of the following: • The continued extraction of rock?—?including periodic blasting to fragment the rock prior to excavation?—?from the existing permitted quarry area (Plan File Ref. No.?18/858) beyond the current permission expiry date; • The continued use of existing quarry infrastructure (including crushing, screening and lime processing plant), existing pre-cast manufacturing facility (including associated ancillary works for manufacturing of concrete products), batching of lime products, workshop, canteen, toilet facilities, weighbridges, wheelwash, fuel stor-age area and switch room, settlement lagoons, haul roads, ESB substation, plant and product storage areas and all other ancillary facilities as permitted under Plan File Ref. No. 18/858; • The continued use of site offices authorised under Plan File Ref. No. 20/891; • A lateral extension of the existing limestone quarry, within an area of approx. 4.5 Ha., comprising: - approximately 18.2 hectares of extraction, including blasting, over 2 no. c 19 metre high benches to a final floor level ranging from 25 to 30m OD; and - overburden storage areas and landscaped screening berms (6.3 Ha). • To access the extension lands rock will be extracted - including by controlled blasting - from under: - approx. 1.4 hectare of land that is currently under landscaping measures authorised under Plan File Ref. No. 18/858; - approx. 2.1 hectare of land that is currently in use as an access ramp authorised under Plan File Ref. No. 18/858. • The removal of topsoil and overburden, construction of landscaped screening berms, and provision of an overburden storage area; • Demolition of an existing farmyard and associated buildings and structures, permitted under Plan File Ref. No. 15/595, and removal of approximately 6.81 hectares of commercial forestry within the proposed extension area to allow for the proposed quarry development; • All associated ancillary site facilities/works, including surface water management, internal haul roads, phased restoration, and landscaping. The applicant is seeking a 25-year permission for extraction and associated activities, with an additional 2 years for final site restoration. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR).

Description as published by the council. Its text starts part-way through a sentence.

Location
Bennettsbridge, Co. Kilkenny Map
Planning reference
2560532
Applicant
Bennettsbridge Limestone Quarries Unlimited Company

Numbers and dates

Project type
Quarry
Received
18 Aug 2025
Council decision
30 Jul 2026
Appeal lodged
26 Aug 2026

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged

Site history

This site's history

  1. Earlier permission 18858 for this site: granted 11 Jun 2019.

    The development consists of a total area of 36.5 Hectares comprising of the following: Deepening of 13.4 hectares which was previously… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Work packages named so far

  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

The exact Commission appeal 501961 was lodged on 26 August 2026 and is pending. These findings describe the July 2025 application EIAR; they do not establish the final appeal outcome, later revised details or new equipment orders.

3 official documents inspected · Checked 2026-09-05 · Official file index

The extension and the separate asphalt plant have different scopes

Proposed in application · Kilkenny 2560532: continued quarry use and the proposed lateral extension

What the evidence says
The July 2025 EIAR describes a 24.5 ha lateral extension: 18.2 ha of extraction and 6.3 ha of storage and screening berms. It explicitly excludes the independently operated asphalt plant from this application, while considering it for cumulative assessment.

Why it may matter — interpretation
Interpretation: keeps the extension, extraction footprint and neighbouring operation distinct.

What is not established
The current appeal outcome and any later amended footprint are not established.

Inspect the evidence

EIAR Chapter 3: Project Description · p.4
within an area of approx. 24.5 Ha. · Issued July 2025 (month only) · July 2025 application EIAR; received stamp dated 18 August 2025; received 2025-08-18 · Checked 2026-09-05

within an area of approx. 24.5 Ha.

The application proposes continued use of existing processing plant

Proposed in application · Processing for the proposed quarry extension; existing plant identified in the July 2025 EIAR

What the evidence says
The project description says the lateral extension uses the existing fixed and mobile crushing and screening plant. It states that no extra crushing or screening equipment is required. This is the applicant's proposed operating arrangement, not a new equipment purchase.

Why it may matter — interpretation
Interpretation: avoids treating a quarry extension as evidence of a new processing-plant order.

What is not established
Plant manufacturers, replacement work, procurement and current operational condition are not established.

Inspect the evidence

EIAR Chapter 3: Project Description · p.8
No extra crushing or screening equipment is required · Issued July 2025 (month only) · July 2025 application EIAR; received stamp dated 18 August 2025; received 2025-08-18 · Checked 2026-09-05

No extra crushing or screening equipment is required

The water report describes pumping, settlement and monitored discharge

Proposed in application · Existing quarry water management described in the July 2025 application

What the evidence says
The water chapter routes quarry water through a concrete tank sump and settlement ponds, with a hydrocarbon interceptor between the ponds. It describes a flume and ultrasonic flow meter at the discharge. The report proposes using this existing system for the extension; its capacity claim has not been independently certified here.

Why it may matter — interpretation
Interpretation: identifies the civil and monitoring systems while preserving their reported existing status.

What is not established
New pump or interceptor procurement, current certification and any appeal-imposed upgrade are not established.

Inspect the evidence

EIAR Chapter 8: Water · p.11
Flume Control structure and ultrasonic Flow Meter · Issued July 2025 (month only) · July 2025 application EIAR; received stamp dated 18 August 2025; received 2025-08-18 · Checked 2026-09-05

Flume Control structure and ultrasonic Flow Meter

The reported borehole supply serves operational water uses

Proposed in application · Reported existing water supply supporting proposed continued quarry use

What the evidence says
The water report describes a supply borehole averaging 350 cubic metres per day for offices, concrete batching, cooling, dust suppression and the wheelwash. It describes the existing wastewater system separately. This is reported operational supply, not a new mains connection or a newly approved abstraction quantity.

Why it may matter — interpretation
Interpretation: separates operational water supply from wastewater infrastructure and proposed new work.

What is not established
Current measured demand, abstraction authorisation and a new water-system contract are not established.

Inspect the evidence

EIAR Chapter 8: Water · p.12
an average of 350m3/d · Issued July 2025 (month only) · July 2025 application EIAR; received stamp dated 18 August 2025; received 2025-08-18 · Checked 2026-09-05

an average of 350m3/d

The mitigation schedule specifies woodland and hedgerow works

Proposed in application · Application mitigation for the proposed quarry extension

What the evidence says
The July 2025 schedule proposes about 5.5 ha of mixed broadleaved woodland on screening berms, about 860 m of new native hedgerow and enhancement of about 300 m of existing hedgerow. These are different landscape measures, not one combined area or an installed planting schedule.

Why it may matter — interpretation
Interpretation: identifies the proposed landscape package without combining unlike quantities.

What is not established
Final approved planting details, species quantities, procurement and completed planting are not established.

Inspect the evidence

EIAR Chapter 17: Mitigation and Monitoring · p.5
Approx. 5.5 ha of mixed broadleaved woodland · Issued July 2025 (month only) · July 2025 application EIAR; received stamp dated 18 August 2025; received 2025-08-18 · Checked 2026-09-05

Approx. 5.5 ha of mixed broadleaved woodland
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. The Commission page lists 30 PDF links. Selected pages from three chapters were visually inspected. The other chapters, appendices, council decision conditions and later appeal submissions have not been fully reviewed. Proposals do not establish procurement or installed work.

How we know this

From the Kilkenny County Council planning register, checked 26 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Bennettsbridge

Get alerts for BennettsbridgeFree. We email you when new applications appear.

Free email alerts

Get new Bennettsbridge projects by email

New applications, decisions and site starts in Bennettsbridge, Co. Kilkenny. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options