Temporary/event, Jamestown Treated Water Storage, Oldcourt and Jamestown, Co...
for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 7 Nov 2025. / Confidence: LowDecision date 7 Nov 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kilkenny County Council
- Exact reference
- 2560594
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event
The public application record identifies temporary/event in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Kilkenny planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and electrical service connections; (d) Modifications to the existing electrical control system to support new works; (e) Extension to the existing high fence around the existing storage site, to incorporate the expanded site; (iii) Solar PV panels to area; to be mounted on the new service reservoir roof slab (static and south-west facing); (iv) Associated temporary works including temporary compound area for the construction period; (v) Associated works including landscaping and biodiversity net gain. There are no demolition works proposed as part of this Project. In addition, a Landscaping and Biodiversity Net Gain (BNG) Plan has been prepared as part of the proposed development. Refer to Volume 2, Drawing No. 20788-NOD-04-XX-DR-C08015 for a copy of the Landscape Plan. Planting shall commence in the first planting season following commencement of development on the site
Application to site progress
-
Applied 15 Sep 2025 2560594
-
Decision Conditional 7 Nov 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560594
for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and electrical service connections; (d) Modifications to the existing electrical control system to support new works; (e) Extension to the existing high fence around the existing storage site, to incorporate the expanded site; (iii) Solar PV panels to area; to be mounted on the new service reservoir roof slab (static and south-west facing); (iv) Associated temporary works including temporary compound area for the construction period; (v) Associated works including landscaping and biodiversity net gain. There are no demolition works proposed as part of this Project. In addition, a Landscaping and Biodiversity Net Gain (BNG) Plan has been prepared as part of the proposed development. Refer to Volume 2, Drawing No. 20788-NOD-04-XX-DR-C08015 for a copy of the Landscape Plan. Planting shall commence in the first planting season following commencement of development on the site
Open official record