Decision covers a 3,140 m² mill extension, stack and substation relocation
Decision notification; final permission and commencement not established
What the evidence says
The 25 August notification decides to grant the 3,140 m² feed-manufacturing and warehouse extension, including a raised roof section to 17 metres, a 35-metre cooling-air stack, canopies and demolition/replacement of the ESB substation. The March elevation sheet distinguishes existing and proposed structures; the July revised layout places the extension and replacement substation within the current site package.
Why it may matter — interpretation
Structural, process-equipment and electrical teams should coordinate the tall process structures, existing-building interface and substation move.
What is not established
A final grant, construction start, equipment supplier and agreed electrical connection capacity are not established.
Inspect the evidence
Notification of decision to grant and conditions · p.1
Decision scope: 3140 m2, roof 17 m, cooling-air stack 35 m and replacement ESB substation · Issued 2026-08-25 · Decision dated 25 August 2026; 17 conditions · Checked 2026-09-07
Decision scope: 3140 m2, roof 17 m, cooling-air stack 35 m and replacement ESB substation
Proposed elevations, sections and ESB substation · p.1
P-201 A: existing/proposed elevations, sections and substation · Issued 2026-03-06 · 24-036 P-201 revision A; planning application, received 20 March 2026 · Checked 2026-09-07
P-201 A: existing/proposed elevations, sections and substation
Revised site layout · p.1
P-011 C: extension footprint and ESB substation relocation · Issued 2026-07-17 · 24-036 P-011 revision C, planning application RFI; received 29 July 2026 · Checked 2026-09-07
P-011 C: extension footprint and ESB substation relocation