Small multi-unit · Co. Kilkenny

Castletown, Galmoy, Co Kilkenny

Granted 6 Jul 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660278 at Castletown, Galmoy, Co Kilkenny: 8 homes.
  • The applicant is Shanoon Resources Ltd. The agent is Hannah McGillycuddy.
  • It was received by Kilkenny County Council on 13 May 2026.
  • Status: Granted 6 Jul 2026.
  • Permission was granted on 6 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Kilkenny County Council planning register, checked 23 Jul 2026. Open the council's file

More planning applications in Galmoy · Planning applications in Co. Kilkenny

What and where

8 homes

for development at this site. The development will consist of the provision of residential accommodation (8 modular housing units) for the exclusive occupation by workers to Galmoy Mine for the duration of the mine life within a site area of 0.55 ha. The development will also include provision of a wastewater treatment system and associated percolation area, bin storage area, parking, extension of an internal road (c. 165 m) and all associated ancillary works

Description as published by the council. Its text starts part-way through a sentence.

Location
Galmoy, Co. Kilkenny Map
Planning reference
2660278
Applicant
Shanoon Resources Ltd
Agent
Hannah McGillycuddy

Numbers and dates

Homes
8
Floor area
283 m²
Estimated construction value
€430k to €550kOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Small multi-unit
Received
13 May 2026
Granted
6 Jul 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 6 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660278 on eplanning.ie: drawings, reports and the decision.Open the council's file

Reviewed build intelligence

What the documents establish

Government document review

Final permission covers eight modular units exclusively for mine workers, with removal required on mine closure. This is temporary workforce accommodation; occupation, servicing compliance and installation are not established.

4 official documents inspected · Checked 2026-09-07 · Official file index

Eight modular units are restricted to mine workers and must be removed at closure

Final permission for temporary workforce accommodation tied to mine life

What the evidence says
The final grant signed 10 August covers eight modular accommodation units, wastewater treatment, parking and an approximately 165-metre internal-road extension. Condition 2 restricts occupation to Galmoy Mine workers and requires removal when the mine closes. The May layout separates the accommodation compound from existing mine infrastructure.

Why it may matter — interpretation
Modular suppliers and site teams must include the occupational restriction and eventual removal in the delivery package.

What is not established
Installation, occupation, mine-closure timing and any permanent residential use are not established.

Inspect the evidence

Final grant for mine-worker accommodation · p.1
Final grant 10 August: eight modular units exclusively for Galmoy Mine workers · Issued 2026-08-10 · Signed 10 August 2026; incorporates nine conditions of 6 July decision · Checked 2026-09-07

Final grant 10 August: eight modular units exclusively for Galmoy Mine workers

Decision notification and nine conditions · p.4
Condition 2: mine workers only; units removed upon mine closure · Issued 2026-07-06 · Decision dated 6 July 2026 · Checked 2026-09-07

Condition 2: mine workers only; units removed upon mine closure

Proposed mine-accommodation site layout · p.1
Drawing 03 A: accommodation compound and existing mine infrastructure · Issued May 2026 (month only) · Drawing 03 revision A, project 501.00884.00001; May 2026; received 13 May · Checked 2026-09-07

Drawing 03 A: accommodation compound and existing mine infrastructure

A 240-square-metre polishing filter needs site-specific completion certification

Submitted site-specific system subject to installation, variation and certification conditions

What the evidence says
The April wastewater proposal illustrates a pumped distribution network over a 24-by-10-metre percolation area, and the May site layout labels a 240-square-metre soil polishing filter. The proposal requires engineer approval before installation. Condition 4 requires qualified certification and site-specific as-constructed layouts and sections before occupation; generic sections are insufficient, and any agreed variation must be placed on the council file.

Why it may matter — interpretation
Wastewater contractors need to allow for the filter footprint, site clearances, engineering supervision and completion evidence.

What is not established
Installed system, final engineer-approved specification, accepted variations and commissioning are not established.

Inspect the evidence

Site-specific wastewater treatment and pumped-distribution proposal · p.8
24,000mm by 10,000mm percolation network and cross-section · Issued 2026-04-30 · Site-specific proposal dated 30 April 2026; received 13 May · Checked 2026-09-07

24,000mm by 10,000mm percolation network and cross-section

Site-specific wastewater treatment and pumped-distribution proposal · p.7
Final specification to be approved by site engineer before installation · Issued 2026-04-30 · Site-specific proposal dated 30 April 2026; received 13 May · Checked 2026-09-07

Final specification to be approved by site engineer before installation

Proposed mine-accommodation site layout · p.1
Proposed soil polishing filter 240m2 · Issued May 2026 (month only) · Drawing 03 revision A, project 501.00884.00001; May 2026; received 13 May · Checked 2026-09-07

Proposed soil polishing filter 240m2

Decision notification and nine conditions · p.5
Condition 4: site-specific as-constructed certification before occupation · Issued 2026-07-06 · Decision dated 6 July 2026 · Checked 2026-09-07

Condition 4: site-specific as-constructed certification before occupation

A signed public-water connection agreement is required before works

Pre-commencement servicing condition retained by final grant

What the evidence says
Condition 7 requires a signed Uisce Eireann water connection agreement before commencement and compliance with its standards and conditions. The permission for the modular units does not establish that the agreement or an operational water connection is in place.

Why it may matter — interpretation
Modular installation and civil works should be scheduled around the connection agreement and service delivery.

What is not established
Signed agreement, connection capacity and live water service are not established.

Inspect the evidence

Decision notification and nine conditions · p.6
Condition 7: water connection agreement before commencement · Issued 2026-07-06 · Decision dated 6 July 2026 · Checked 2026-09-07

Condition 7: water connection agreement before commencement

Dewatering needs council approval and runoff must remain uncontaminated

Construction and operational water-protection conditions

What the evidence says
Conditions 6 and 8 require protection of adjacent surface waters, management of sediment-bearing runoff, and council approval before any dewatering works. Only clean stormwater may enter the proposed surface-water system; washing vehicles or areas involving cementitious products is prohibited on site.

Why it may matter — interpretation
Groundworks teams need an approved dewatering approach and separate arrangements for contaminated water and concrete operations.

What is not established
Dewatering approval, installed runoff controls and monitoring results are not established.

Inspect the evidence

Decision notification and nine conditions · p.5
Condition 6: protect adjacent waters and manage contaminated runoff · Issued 2026-07-06 · Decision dated 6 July 2026 · Checked 2026-09-07

Condition 6: protect adjacent waters and manage contaminated runoff

Decision notification and nine conditions · p.6
Condition 8: clean stormwater; prior approval for dewatering; no cementitious washdown · Issued 2026-07-06 · Decision dated 6 July 2026 · Checked 2026-09-07

Condition 8: clean stormwater; prior approval for dewatering; no cementitious washdown
Remaining document questions
  • Have the water agreement and site-specific wastewater completion evidence been secured for this temporary compound?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

How we know this

From the Kilkenny County Council planning register, checked 23 Jul 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Galmoy

Get alerts for GalmoyFree. We email you when new applications appear.

Free email alerts

Get new Galmoy projects by email

New applications, decisions and site starts in Galmoy, Co. Kilkenny. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options