The development will consist of: (i) A partial demolition of the existing two-storey extension on the south wing of the Manor House; (ii) the construction of a new two-storey extension (c.1,246 m²) to the south of the Manor House, to provide: (a) dining room, bar, private dining, kitchen extension, WC’s, and cloakroom at...
The record describes what is sought. Nothing is permitted until the authority decision.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
A decision-stage public state is indexed. / Confidence: LowA decision-stage public state is indexed.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will consist of: (i) A partial demolition of the existing two-storey extension on the south wing of the Manor House; (ii) the construction of a new two-storey extension (c.1,246 m²) to the south of the Manor House, to provide: (a) dining room, bar, private dining, kitchen extension, WC’s, and cloakroom at ground floor level; and (b) ancillary back-of-house facilities, staff changing rooms, staff office, staff canteen, and service areas at lower ground floor level; (iii) the construction of a new...
Named firms
Public source roles
- Golden Beam Hospitality Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kilkenny County Council
- Exact reference
- 2660493
- Evidence reviewed
- 5 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Golden Beam Hospitality Ltd
- Planning agent
- Hughes Planning
- Agent address
- 85 Merrion Square South Dublin 2 Co. Dublin D02 FX60
More Kilkenny planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will consist of: (i) A partial demolition of the existing two-storey extension on the south wing of the Manor House; (ii) the construction of a new two-storey extension (c.1,246 m²) to the south of the Manor House, to provide: (a) dining room, bar, private dining, kitchen extension, WC’s, and cloakroom at ground floor level; and (b) ancillary back-of-house facilities, staff changing rooms, staff office, staff canteen, and service areas at lower ground floor level; (iii) the construction of a new two storey extension (c.2,586 m²) to the north of the Manor House, to provide: (a) 19 no. guest suites, linen store, and outdoor thermal spa at ground floor level; and (b) reception/lobby, and spa facilities (including spa reception, café, kitchen, staff office, 13 no. treatment rooms, indoor thermal spa and ancillary facilities) at lower ground floor level; (iv) the provision of 37 no. car parking spaces including 5 no. accessible spaces and 5 no. EV spaces (in addition to existing 45 no. spaces); (vi) upgrade of existing pumping station; and (vii) all associated works including site clearance, tree removal, hard and soft landscaping, boundary treatments, public lighting, signage, ESB substation and plant room, and PV panels as necessary to facilitate the development
Application to site progress
-
Applied 6 Aug 2026 2660493
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660493
The development will consist of: (i) A partial demolition of the existing two-storey extension on the south wing of the Manor House; (ii) the construction of a new two-storey extension (c.1,246 m²) to the south of the Manor House, to provide: (a) dining room, bar, private dining, kitchen extension, WC’s, and cloakroom at ground floor level; and (b) ancillary back-of-house facilities, staff changing rooms, staff office, staff canteen, and service areas at lower ground floor level; (iii) the construction of a new two storey extension (c.2,586 m²) to the north of the Manor House, to provide: (a) 19 no. guest suites, linen store, and outdoor thermal spa at ground floor level; and (b) reception/lobby, and spa facilities (including spa reception, café, kitchen, staff office, 13 no. treatment rooms, indoor thermal spa and ancillary facilities) at lower ground floor level; (iv) the provision of 37 no. car parking spaces including 5 no. accessible spaces and 5 no. EV spaces (in addition to existing 45 no. spaces); (vi) upgrade of existing pumping station; and (vii) all associated works including site clearance, tree removal, hard and soft landscaping, boundary treatments, public lighting, signage, ESB substation and plant room, and PV panels as necessary to facilitate the development