Site start · Co. Laois
Portlaoise, Laois
Granted 27 Mar 2024 (final grant issued 7 May 2024)
Key facts
- Site start record 2360348 at Portlaoise, Co. Laois: Mixed-use development.
- The planning authority is Laois County Council.
- Status: Granted 27 Mar 2024 (final grant issued 7 May 2024).
Source: the Laois County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Portlaoise · Planning applications in Co. Laois
Council register
The council's register shows: Granted on 27 Mar 2024.
Search the Laois planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Mixed-use development
Proposed works at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian/cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Proposal for the removal of the redundant western arm of the roundabout to the southeast at the Holy Family School Road and the provision of new active travel infrastructure incorporating a two-way cycle track with the adjoining footpath along the eastern boundary which transitions to a shared pedestrian / cycle facility to the north as it approaches the O’Kelly roundabout, and continues on the southern side of Aghnaharna Drive on the western arm of this roundabout. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. A pumping station is proposed southwest of the main development site. The development site area, roadworks, water and drainage works, and pumping station will provide a total application site area of c. 3.39 Ha. The development will consist of: a 2 No. storey Neighbourhood Centre (1,484 sq m) principally comprising a retail unit 361 sq m), a creche (289 sq m), refuse storage (23 sq m) and cycle storage (65 sq m) at ground floor level and office floorspace (746 sq m) at ground and first floor level; the provision of 57 No. houses (comprising of: 5 No. detached dwellings (three-storey 5-bed); 3 No. semi-detached corner dwellings (two-storey 4-bed); 29 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 5 No. 3 No. storey duplexes comprising 5 No. 2-bed units and 5 No. 3-bed units. The development will also include: a new Link Road through the site, providing vehicular entrance/exit to the site via O’Devoy (O’Deevy) roundabout; roof plant at the Neighbourhood Centre; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-stations; lighting; and all associated site and development works above and below ground.
- Location
- Portlaoise, Co. Laois Map
- Council
- Laois County Council
- Planning reference
- 2360348
- Application type
- Commencement Notice
- Owner named on the notice
- Bircrest Ltd
- Agent named on the notice
- Boderg Ltd
Numbers and dates
- Project type
- Mixed use
- Received
- 1 Sep 2023
- Decision to grant
- 27 Mar 2024
- Final grant
- 7 May 2024
- Site start notified
- 2 Sep 2024
Documents and evidence
Check the record
- Council planning fileThe application file 2360348 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Planning Report in the council's file.
- Unit mix
- 57 dwellings, 10 duplexes
- Site area
- 2.98 ha
- Applicant in the planning documents
- Bircrest Limited
- Scope
- Proposed neighbourhood centre with retail, offices, creche and 67 residential units on 2.98 ha at Summerhill, Portlaoise.
How we know this
From the Laois County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 2 Sep 2024Notice filed · phase 1 · The development will consist of the provision of 57 No. residential dwellings including...View the site start
- 27 Sep 2024Notice filed · phase 2 · The development will consist of the provision of 1 no. duplex units...Notice re-filed 4 Oct 2024 for the same works.View the site start
- 27 Jan 2026Notice filed · phase 3 · The development will consist of the provision of two storey neighbourhood centre...View the site start
- Completion certificate recordedRecorded in Sep 2024 · 38 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Sep 2024 · 17 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Sep 2024 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.