Large residential · Co. Laois

45 homes, Portlaoise, Co. Laois

Granted 26 Jan 2024 (final grant issued 13 Mar 2024)

We no longer update this application, so we can't email you about it. Get new planning applications in Portlaoise by email

Key facts

  • Planning application 2360350 at Portlaoise, Co. Laois: 45 homes.
  • The applicant is Bircrest Limited.
  • It was received by Laois County Council on 1 Sep 2023.
  • Status: Granted 26 Jan 2024 (final grant issued 13 Mar 2024).

Source: the Laois County Council planning register, as last seen on 2 Jun 2026. Open the council's file

More planning applications in Portlaoise · Planning applications in Co. Laois

Council register

The council's register shows: Granted on 26 Jan 2024.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

45 homes

Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.

Location
Portlaoise, Co. Laois Map
Planning reference
2360350

Numbers and dates

Homes
45
Floor area
5,940 m²
Estimated construction value
€9.0m to €12mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Large residential
Received
1 Sep 2023
Decision to grant
26 Jan 2024
Final grant
13 Mar 2024
Site start notified
26 Apr 2024

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • CladdingNamed in the planning documents
  • Windows/doorsNamed in the planning documents
  • RoofingNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2360350 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Planning Report in the council's file.
    Unit mix
    45 dwellings
    Site area
    2.14 ha
    Applicant in the planning documents
    Bircrest Limited
    Phasing
    single phase
    Scope
    Application for permission for residential development comprising 45 dwellings on lands at Summerhill, Portlaoise, Co. Laois.
    Cladding
    “composite cladding to selected RAL colour”
    Windows/doors
    “double glazed window with frame to selected RAL colour”
    Roofing
    “concrete tile to selected colour”

How we know this

From the Laois County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Site starts and completion

  1. 26 Apr 2024Notice filed · The development will consist of the provision of 45 No. residential dwellings including...View the site start
  2. Completion certificate recordedRecorded in Apr 2024 · 23 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  3. Completion certificate recordedRecorded in Apr 2024 · 3 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  4. Completion certificate recordedRecorded in Apr 2024 · 19 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Portlaoise

Get alerts for PortlaoiseFree. We email you when new applications appear.

Free email alerts

Get new Portlaoise projects by email

New applications, decisions and site starts in Portlaoise, Co. Laois. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options