45 homes, Portlaoise, Co. Laois
Granted 26 Jan 2024 (final grant issued 13 Mar 2024)
We no longer update this application, so we can't email you about it. Get new planning applications in Portlaoise by email
Key facts
- Planning application 2360350 at Portlaoise, Co. Laois: 45 homes.
- The applicant is Bircrest Limited.
- It was received by Laois County Council on 1 Sep 2023.
- Status: Granted 26 Jan 2024 (final grant issued 13 Mar 2024).
Source: the Laois County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Portlaoise · Planning applications in Co. Laois
Council register
The council's register shows: Granted on 26 Jan 2024.
Search the Laois planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
45 homes
Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.
- Location
- Portlaoise, Co. Laois Map
- Council
- Laois County Council
- Planning reference
- 2360350
- Applicant
- Bircrest Limited
Numbers and dates
- Homes
- 45
- Floor area
- 5,940 m²
- Estimated construction value
- €9.0m to €12mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 1 Sep 2023
- Decision to grant
- 26 Jan 2024
- Final grant
- 13 Mar 2024
- Site start notified
- 26 Apr 2024
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2360350 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Planning Report in the council's file.
- Unit mix
- 45 dwellings
- Site area
- 2.14 ha
- Applicant in the planning documents
- Bircrest Limited
- Phasing
- single phase
- Scope
- Application for permission for residential development comprising 45 dwellings on lands at Summerhill, Portlaoise, Co. Laois.
- Cladding
- “composite cladding to selected RAL colour”
- Windows/doors
- “double glazed window with frame to selected RAL colour”
- Roofing
- “concrete tile to selected colour”
How we know this
From the Laois County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 26 Apr 2024Notice filed · The development will consist of the provision of 45 No. residential dwellings including...View the site start
- Completion certificate recordedRecorded in Apr 2024 · 23 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Apr 2024 · 3 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Apr 2024 · 19 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.