Site start · Co. Laois
Emo, Laois
Granted 26 Aug 2024 (final grant issued 8 Oct 2024)
Key facts
- Site start record 2460389 at Emo, Co. Laois: 3 homes.
- The planning authority is Laois County Council.
- Status: Granted 26 Aug 2024 (final grant issued 8 Oct 2024).
Source: the Laois County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Emo · Planning applications in Co. Laois
Council register
The council's register shows: Granted on 26 Aug 2024.
Search the Laois planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
3 homes
construct 3 short term letting units, including 2 x two-beds and 1x one-single bed units, utility extension to existing dwelling house, decommission existing septic tank, new septic tank treatment system with percolation area and all associated site works. Listed on the Record of Protected Structures under RPS 981..
- Location
- Emo, Co. Laois Map
- Council
- Laois County Council
- Planning reference
- 2460389
- Application type
- Commencement Notice
- Owner named on the notice
- CaToCa Ltd
- Agent named on the notice
- Tilbury Construction Ltd
Numbers and dates
- Homes
- 3
- Floor area
- 128 m²per planning documents
- Estimated construction value
- €580k to €750kOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Protected structure
- Received
- 2 Jul 2024
- Decision to grant
- 26 Aug 2024
- Final grant
- 8 Oct 2024
- Site start notified
- 8 Dec 2025
- Protected structure
- Yes, RPS 981
Documents and evidence
Check the record
- Council planning fileThe application file 2460389 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Unit mix
- 2 2-bed, 1 1-bed
- Floor area
- 128 m² (per planning documents)
- Site area
- 0.132 ha
- Scope
- Permission for 3 short-term letting units, utility extension to existing dwelling, decommission existing septic tank, new septic tank treatment system with percolation area and all associated site works.
- Wastewater
- “New Molloy Precast Chieftain SBR sewage treatment system”
How we know this
From the Laois County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 8 Dec 2025Notice filed · phase 1 · construct utility extension to existing dwelling house (Gate Lodge), decommission...View the site start
- 9 Feb 2026Notice filed · phase 2 · Construct a 2 Bed Modular Pod - Granted permission as a Short term Letting units Within...View the site start
- 9 Feb 2026Notice filed · phase 3 · Construct a 2 Bed Modular Pod - Granted permission as a Short term Letting units Within...View the site start
- 9 Feb 2026Notice filed · phase 4 · Construct a 1 Bed Modular Pod - Granted permission as a Short term Letting units Within...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.