Temporary/event · Co. Laois
Townlands of Morett Killone, Cappakeel Rossmore and Raheennahown North, Co. Laois.
Granted 18 Sep 2025
Key facts
- Planning application 2560148 at Townlands of Morett Killone, Cappakeel Rossmore and Raheennahown North, Co. Laois.: Develop.
- It was received by Laois County Council on 24 Mar 2025.
- Status: Granted 18 Sep 2025.
- Permission was granted on 18 Sep 2025 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Laois County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Develop
develop at this site within the Townlands of Morett, Killone, Cappakeel, Rossmore and Raheennahown north, Co. Laois. The development will consist of a 10-year permission and 40-year operational life for a solar farm on 5 no. land parcels as described herein: West Parcel (A) (Morett townland), Central West Parcel (B) (Morett & Cappakeel. townlands), Centre Parcel (C) (Morett & Cappakeel. townlands), Centre East Parcel (D) (Cappakeel townland) and East Parcel (E) (Rossmore townland). The total site area for the proposed development is c. 249 hectares and consists of the following; c. 1,796,838sq. metres of solar photovoltaic panels on ground mounted steel frames; 44 no. hardstandings for electrical skids and storage; underground power and communication cables and ducts; c. 22,753m. of boundary security fencing; c. 12,915m. of new and existing internal access tracks including 2 no. open span bridge crossings; associated drainage infrastructure; 5 no. site entrances which include the upgrading of 2 no. access points onto the L3930, 1 no. new access point onto the L7815 local road and 2 no. new access points onto the L3930 local public road; 5 no. temporary construction compounds; landscaping and biodiversity enhancement measures and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 7,189 metres in length along the solar farm lands including 4 no. Horizonal Directional Drilling points to traverse the Dunrally stream and the local roads L3930, L3901 and L3817. A separate planning application will be made to An Bord Pleanála as part of a Strategic Infrastructure Development (SID). This will include the provision of a 110kV substation with electrical control building and ancillary electrical infrastructure, associated compound with palisade fence which is to be located in the West Parcel (A) in the townland of Morett. The substation will connect to the national grid via. A LILO grid connection onsite. This planning application will be lodged with An Bord Pleanála in due course. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this planning application.
- Location
- Co. Laois Map
- Council
- Laois County Council
- Planning reference
- 2560148
Numbers and dates
- Homes
- 1
- Project type
- Temporary/event
- Received
- 24 Mar 2025
- Granted
- 18 Sep 2025
Timeline
- Application received
- Granted
- Appeal lodged
- Appeal decidedGrant permission
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2560148 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealGrant permission · 500061 / 16 Feb 2026View the appeal record
How we know this
From the Laois County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.