Major Project IntelligenceLinked commencement notices reviewed against the controlling planning scope.

Meadows Fort extension, Graiguecullen

Scope check: planning findings are not automatically phase-specific, and delivery status is not stated.

Supplier-relevant findings are limited to exact official PDF pages, sections and drawings. Planning and commencement evidence remain separate.

  • Authority: Laois County Council
  • Primary ref: 2560210
  • PB ref: PB-10000304097
Permitted 98 Official reviewed scheme figure.
Commenced None indexed Official notice coverage where reconciled; not physical-progress proof.
Signal 90 Official linked-notice coverage; not physical-progress proof.
Remaining Not published Only shown when the reviewed reconciliation supports it.
Value Not official No official contract value is published in this evidence contract.

!Scope check - read before pricing

Notice boundary Linked notices explicitly describe 90 units. The arithmetic difference is eight units, but this is notice coverage only and not evidence of work remaining or purchasing status.
Planning evidence Application-wide findings are not automatically phase-specific. Read each scope label and locator.
Implementation status The official documents identify requirements and intended systems; delivery status is not stated.

Evidence-backed packages

Package signals with public-source support

6 shown
Civils Public Realm Application scope

Surface-water and SuDS

The submitted design names a Kingspan NSBE075 Class 1 bypass separator with alarm and specifies uPVC gravity drainage with a 225 mm minimum pipe size.

Confidence: Explicit official evidence / Medium Source: Engineering Report Locator: PDF page 22; 21 | Page; Sections 3.4 Petrol/Oil & Silt Interception and 3.5 Surface Water Gravity Network Drainage Design; Drainage profiles are referenced for cover and service-conflict checks.; Drainage profiles are referenced for cover and service-conflict checks.
Specialist Constraint Application scope

Site infrastructure

Low CBR results create a specialist geotextile and pavement-foundation design requirement; at 2% CBR the report specifies non-woven Clause 609 separation with 600 mm Class 6F2 capping.

Confidence: Explicit official evidence / Medium Source: Engineering Report Locator: PDF page 14; 13 | Page; Section 2.3 Geotechnical Investigation; pavement design discussion; Figure 3.1, TII DN-PAV-03021-01, and the CBR/capping table are referenced on this page.; Figure 3.1, TII DN-PAV-03021-01, and the CBR/capping table are referenced on this page.
Specialist Constraint Application scope

Roads and active travel

The grant requires a Chapter 8 traffic-management plan and separate Stage 3 and Stage 4 Road Safety Audits at completion and early operation.

Confidence: Explicit official evidence / Medium Source: Final Grant Locator: PDF page 7; Schedule 2 - Page 5 of 7; Condition 14(c)-(e)
+3 further evidenced packages
Heat-pump systems
PDF page 18; Page 15 of 22; Section 6.3 Heating and DHW Production
Application scope
Electrical infrastructure
PDF page 1; Single-sheet planning drawing; no printed page number; General notes and kiosk plan/section/elevations; Drawing 3278-01-DR-DCAE-AR-P1011-A01; reference P1011; Planning; A3; revision A01 dated 01/04/2025; scales 1:50 and 1:2000.; Drawing 3278-01-DR-DCAE-AR-P1011-A01; reference P1011; Planning; A3; revision A01 dated 01/04/2025; scales 1:50 and 1:2000.
Application scope
Attenuation and flow control
PDF page 4; Schedule 2 - Page 2 of 7; Condition 6(d)-(e)
Application scope

Only packages with explicit public-source support are shown. No generic trade tags are added.

Project-scope facts

Context that frames the packages

1 facts

Permission and notice scope

The official permission records 98 residential units. Linked notices cover 90 stated units.

Application scope Confidence: Reviewed Locator: Final-grant scope and separately listed commencement chronology
Location coordinates not suppliedOpen the official source before relying on map position.

Source-aware chronology

Four source groups kept separate

Planning application / amendment

Application, amendment, related and parent scopes remain distinct.

  1. 2560210Application receipt date recorded in the final-grant document.
  2. 2560210Final grant records 98 residential units.

Appeals

Only reviewed appeal evidence is shown in this lane.

  1. No appeal record is evidenced in the reviewed source set.Absence is rendered explicitly.

Official commencement notices

Notice evidence is separate from planning permission and physical progress.

  1. CN0134942LSConstruct Stage One of a 98-unit residential development comprising 30no. two-storey semi- detached houses (28no. three- bedroom and 2no. four-bedroom)
  2. CN0138652LSConstruct Stage Two of a 98-unit residential development comprising 28no. two-storey semi- detached houses (24no. three- bedroom and 4no. four-bedroom)
  3. CN0140499LSConstruction Stage Three of a 98-unit residential development comprising 32no. two-storey semi- detached houses (30no. three- bedroom and 2no. four-bedroom)

Unreconciled source signal

Dashed context only; never promoted to official commencement evidence.

  1. No separate unreconciled source signal is published.Absence is rendered explicitly.

Evidence register

Accessible source rows

7 rows