Infrastructure, St Fintan’s Hospital, Dublin Road, Portlaoise
develop a new primary care centre located on a vacant site immediately adjoining the Dublin Road and to the East of the existing car park, interlinked to the core public services and administration block of the existing protected structure (NIAH Reg. No. 12508088) St. Fintan’s Hospital building. The proposed development...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 27 Jan 2026. / Confidence: LowDecision date 27 Jan 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
develop a new primary care centre located on a vacant site immediately adjoining the Dublin Road and to the East of the existing car park, interlinked to the core public services and administration block of the existing protected structure (NIAH Reg. No. 12508088) St. Fintan’s Hospital building. The proposed development comprises: a) a four-storey Primary Care Centre building (total gross floor area c. 5,845m²) incorporating general practitioner (GP) surgeries, dental and orthodontic surgeries, outpatient...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Laois County Council
- Exact reference
- 2560542
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Health Service Executive
- Planning agent
- Darryl Wylie
- Agent address
- Mill House Mill Street Dundalk A91 XTF7
More Laois planning activity
These are county discovery links, not claimed relationships to this application.
Application text
develop a new primary care centre located on a vacant site immediately adjoining the Dublin Road and to the East of the existing car park, interlinked to the core public services and administration block of the existing protected structure (NIAH Reg. No. 12508088) St. Fintan’s Hospital building. The proposed development comprises: a) a four-storey Primary Care Centre building (total gross floor area c. 5,845m²) incorporating general practitioner (GP) surgeries, dental and orthodontic surgeries, outpatient consulting and treatment rooms, physiotherapy and occupational therapy rooms, group rooms, (CAMHS and day hospital), X-ray and ultrasound services, administrative offices, ancillary staff and meeting rooms, clinical and utility stores, waiting areas, and all associated circulation and building services; b) provision of site infrastructure including a new car park located to the South-West of the proposed building containing 104 no. surface-level car parking spaces (including 4 no. accessible spaces and 12 no. electric vehicle charging spaces), 80 no. bicycle parking spaces, pedestrian footpaths, cycle paths, boundary treatments, hard and soft landscaping, public lighting, site signage, and all associated site development and drainage works; c) the development includes provision of rooftop plant areas, ESB substation, and vehicular, pedestrian, and cycle access from within the existing St. Fintan’s campus road network and all associated site development works.
Application to site progress
-
Applied 29 Aug 2025 2560542
-
Decision Conditional 27 Jan 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560542
develop a new primary care centre located on a vacant site immediately adjoining the Dublin Road and to the East of the existing car park, interlinked to the core public services and administration block of the existing protected structure (NIAH Reg. No. 12508088) St. Fintan’s Hospital building. The proposed development comprises: a) a four-storey Primary Care Centre building (total gross floor area c. 5,845m²) incorporating general practitioner (GP) surgeries, dental and orthodontic surgeries, outpatient consulting and treatment rooms, physiotherapy and occupational therapy rooms, group rooms, (CAMHS and day hospital), X-ray and ultrasound services, administrative offices, ancillary staff and meeting rooms, clinical and utility stores, waiting areas, and all associated circulation and building services; b) provision of site infrastructure including a new car park located to the South-West of the proposed building containing 104 no. surface-level car parking spaces (including 4 no. accessible spaces and 12 no. electric vehicle charging spaces), 80 no. bicycle parking spaces, pedestrian footpaths, cycle paths, boundary treatments, hard and soft landscaping, public lighting, site signage, and all associated site development and drainage works; c) the development includes provision of rooftop plant areas, ESB substation, and vehicular, pedestrian, and cycle access from within the existing St. Fintan’s campus road network and all associated site development works.
Open official record