Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois

Refused 30 Dec 2025

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560611 at Kilmullen Ullard Or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois: Develop the following within Co. Laois.
  • It was received by Laois County Council on 23 Sep 2025.
  • Status: Refused 30 Dec 2025.

Source: the Laois County Council planning register, checked 2 Jun 2026. Open the council's file

More planning applications in Portarlington · Planning applications in Co. Laois

What and where

Develop the following within Co. Laois

develop the following within Co. Laois: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the Bracklone 110kV substation); • 2 no. proposed single storey inverter stations; • A co-located Battery Energy Storage System (BESS) park (including 16 no. containers with cells and 4 no. containers with PCS and inverters) with associated security fencing and gates; • Site Perimeter fencing; • 1 no. new site entrance with palisade double security gates; • 1 no. temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing; • 1 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 1 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out locations (within temporary construction compound); and • All associated and ancillary works The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NlS) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (RED III) Renewable Energy Directive III (Directive (EU) 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Location
Portarlington, Co. Laois Map
Planning reference
2560611

Numbers and dates

Received
23 Sep 2025
Refused
30 Dec 2025

Timeline

  1. Application received
  2. Refused
  3. Appeal lodged
  4. Appeal decidedGrant permission with conditions

Documents and evidence

Check the record

How we know this

From the Laois County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Portarlington

Get alerts for PortarlingtonFree. We email you when new applications appear.

Free email alerts

Get new Portarlington projects by email

New applications, decisions and site starts in Portarlington, Co. Laois. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options