Commercial fit-out · Co. Limerick
The IDA Business and Technology Park, Raheen, County Limerick.
Granted 16 Apr 2025 (final grant issued 19 May 2025)
We no longer update this application, so we can't email you about it. Get new planning applications in Raheen by email
Key facts
- Planning application 2461160 at The IDA Business and Technology Park, Raheen, County Limerick.: Extensions.
- It was received by Limerick City and County Council on 25 Nov 2024.
- Status: Granted 16 Apr 2025 (final grant issued 19 May 2025).
- Work was due to start on 3 Jun 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Limerick City and County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Raheen · Planning applications in Co. Limerick
Council register
The council's register shows: Granted on 16 Apr 2025.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Extensions
a 10-year permission for development at our existing Biopharmaceutical Manufacturing Campus, located at Ballycummin, The IDA Business and Technology Park, Raheen, County Limerick. The proposed development consists of extensions, modifications, alterations and new structures to previously permitted and partly built Biopharmaceutical Manufacturing Campus (Limerick City and County Council Reg. Ref. 22190 and as amended by planning permission Reg. Ref.23152), with a proposed total additional floor area of approximately 67,997 square metres, located on the existing Eli Lilly site, north of Ballycummin Avenue and bounded by Patrickswell Road (R526). The development consists of all site buildings and infrastructure required to support the new campus extension, including the following; (a) A 4-storey Biopharmaceutical Manufacturing Facility sized approximately 52,400 square metres and approximately 34 metres high, with roof-mounted plant and equipment, including solar panels. (b) An extension to the previously permitted single storey Central Utilities Plant (CUP) Building sized approximately 1,050 square metres and approximately 10.6 metres high, with roof-mounted plant and equipment and additional acoustic screening at roof level. (c) An extension to previously permitted single storey pedestrian link with a roof-mounted pipe rack, sized approximately 3,440 square metres and approximately 10.6 metres high. (d) An extension to the north-west side of the previously permitted 2-storey canteen, laboratory and administration building with roof-mounted plant and equipment, acoustic screens and solar panels at roof level, sized approximately 2,200 square metres and approximately 13.5 metres high. (e) An extension to the south-east side of the previously permitted 2-storey canteen, laboratory and administration building with roof-mounted plant and equipment, acoustic screens and solar panels at roof level, sized approximately 2,200 square metres and approximately 13.5 metres high. (f) An additional 2-storey Central Utilities Plant (CUP) Building sized approximately 5,400 square metres and approximately 10.6 metres high, with 4no. Boiler Stacks approximately 17 metres high and roof-mounted plant and equipment and additional acoustic screening at roof level. (g) A single storey Storage Building sized approximately 520 square metres and approximately 6 metres high located to the north of the site. (h) A single storey Firewater pumphouse sized approximately 90 square metres a
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Raheen, Co. Limerick Map
- Planning reference
- 2461160
Numbers and dates
- Project type
- Commercial fit-out
- Received
- 25 Nov 2024
- Decision to grant
- 16 Apr 2025
- Final grant
- 19 May 2025
- Site start notified
- 3 Jun 2025
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2461160 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Limerick City and County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 3 Jun 2025Notice filed · phase 1 · The proposed development consists of construction of buildings LIM03 Logistics and LIM22...View the site start
- 10 Oct 2025Notice filed · phase 2 · New Single Storey Domestic Water Pump House building and associated ancillary worksView the site start
- 8 Apr 2026Notice filed · phase 3 · Lilly Limerick - WWTP - LIM18 Electrical Operations BuildingView the site start
- 1 May 2026Notice filed · phase 4 · Lilly Limerick - WWTP - LIM17 De-Watering BuildingView the site start
- 1 May 2026Notice filed · phase 5 · Lilly Limerick - WWTP - LIM17 Blower BuildingView the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area