Infrastructure, Coolaboy Dromcollogher and, Mundellihy Ballinlongig Cloonmore...
Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 16 Jul 2026. / Confidence: LowDecision date 16 Jul 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the River Deel at a location approximately 6.5 kilometres to the northwest of the WwTP. The outfall pipe will be...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Limerick City and County Council
- Exact reference
- 2560698
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Uisce Éireann
- Planning agent
- Ian Rathmell
- Agent address
- MKO Tuam Road Galway H91 VW84
More Limerick planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the River Deel at a location approximately 6.5 kilometres to the northwest of the WwTP. The outfall pipe will be located primarily in public roads in the townlands of Coolaboy, Mundellihy, Ballinlongig, Cloonmore and Tulligmacthomas. The existing WwTP will be decommissioned and demolished upon completion of the Proposed Development. The Proposed Development will comprise: i) Development of a new preliminary wastewater treatment plant including infrastructure such as bypass channels and screens; grit and fats, oils, greases (FOG) removal plant; storm water overflow tank; sludge drying reed beds; flash mixer chamber; return liquor pumping station facilities; caustic and ferric dosing storge tanks; flow to full treatment (FFT) pumping station; final settlement tank flow split chamber; 2 no. final clarifiers; sludge draw off chamber (return-activated sludge and waste-activated sludge pumping station); static mixer; wash water pumping station; tertiary disk filter; and final effluent pumping station. ii) Development of an ESB sub-station, control building, and fuel tank. iii) Provision of approx. 54m of new gravity sewer to direct flows to the new WwTP. This will replace an existing combined sewer overflow which will be decommissioned after the process switchover. iv) Provision of adequate site lighting, access gates, access stairs, walkways, car parking and electric charging facilities, and site boundary hedging and fencing. v) Provision of photovoltaic (PV) panels on the site of the existing WwTP following its decommissioning. vi) Provision of site drainage infrastructure including a hydrocarbon interceptor, construction of outfall pipe along public roads, and headwall in Tulligmacthomas. vii) Realignment and widening of existing site entrance, including provision of a new access road into the site and a bridge within the site. viii) All hard and soft landscaping throughout the site, and all associated and ancillary site works. The Proposed Development will be accompanied by a Natura Impact Statement (NIS)
Application to site progress
-
Applied 17 Jul 2025 2560698
-
Decision Conditional 16 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560698
Uisce Éireann intends to apply for a 10-year planning permission to construct a new wastewater treatment plant (WwTP) at Coolaboy, Dromcollogher, Co. Limerick. The Proposed Development will comprise the construction of a new WwTP to provide treatment capacity for a population equivalent (PE) of 1,350 (10 years) and 1,550 (30 years). The wastewater will be treated and discharged via an outfall pipe into the River Deel at a location approximately 6.5 kilometres to the northwest of the WwTP. The outfall pipe will be located primarily in public roads in the townlands of Coolaboy, Mundellihy, Ballinlongig, Cloonmore and Tulligmacthomas. The existing WwTP will be decommissioned and demolished upon completion of the Proposed Development. The Proposed Development will comprise: i) Development of a new preliminary wastewater treatment plant including infrastructure such as bypass channels and screens; grit and fats, oils, greases (FOG) removal plant; storm water overflow tank; sludge drying reed beds; flash mixer chamber; return liquor pumping station facilities; caustic and ferric dosing storge tanks; flow to full treatment (FFT) pumping station; final settlement tank flow split chamber; 2 no. final clarifiers; sludge draw off chamber (return-activated sludge and waste-activated sludge pumping station); static mixer; wash water pumping station; tertiary disk filter; and final effluent pumping station. ii) Development of an ESB sub-station, control building, and fuel tank. iii) Provision of approx. 54m of new gravity sewer to direct flows to the new WwTP. This will replace an existing combined sewer overflow which will be decommissioned after the process switchover. iv) Provision of adequate site lighting, access gates, access stairs, walkways, car parking and electric charging facilities, and site boundary hedging and fencing. v) Provision of photovoltaic (PV) panels on the site of the existing WwTP following its decommissioning. vi) Provision of site drainage infrastructure including a hydrocarbon interceptor, construction of outfall pipe along public roads, and headwall in Tulligmacthomas. vii) Realignment and widening of existing site entrance, including provision of a new access road into the site and a bridge within the site. viii) All hard and soft landscaping throughout the site, and all associated and ancillary site works. The Proposed Development will be accompanied by a Natura Impact Statement (NIS)
Open official record