Protected structure, Bannatyne Mill, Ted Russell Dock, Dock Road, Limerick
for 5 Year Planning Permission for Development - The (1) conservation, restoration and new works to Bannatyne Mill, a protected structure; and (2) change of use of Bannatyne Mill from a grain store to commercial office use at Ted Russell Dock, Dock Road, Limerick City. The proposed works include: (a) demolition and removal of...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 25 Sep 2026. / Confidence: LowDecision date 25 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for 5 Year Planning Permission for Development - The (1) conservation, restoration and new works to Bannatyne Mill, a protected structure; and (2) change of use of Bannatyne Mill from a grain store to commercial office use at Ted Russell Dock, Dock Road, Limerick City. The proposed works include: (a) demolition and removal of the redundant utility compressor room structure and ESB substation structure situated to the west and to the east of the Bannatyne Mill building respectively; (b) modifications to Bannatyne...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Confidence & provenance 1 official source
- Authority
- Limerick City and County Council
- Exact reference
- 2561082
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Shannon Foynes Port Company
- Planning agent
- Mary Hughes Hra Planning
- Agent address
- HRA Planning 3 Hartstonge Street Limerick
More Limerick planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for 5 Year Planning Permission for Development - The (1) conservation, restoration and new works to Bannatyne Mill, a protected structure; and (2) change of use of Bannatyne Mill from a grain store to commercial office use at Ted Russell Dock, Dock Road, Limerick City. The proposed works include: (a) demolition and removal of the redundant utility compressor room structure and ESB substation structure situated to the west and to the east of the Bannatyne Mill building respectively; (b) modifications to Bannatyne Mill building including: (i) internal modifications with limited removal of fixtures and fittings, (ii) provision of 3 no. projecting glass windows on the northern, southern and eastern elevations; (c) provision of associated signage; (d) provision of external plant including new ESB substation / utility building and raised heat pump enclosure; (e) modification to layout arrangement including; (i) widening of the existing eastern access including removal of stone piers; (ii) removal of section of boundary wall to Dock Road and replacement with new wall and railings; (iii) provision of on-site car parking and covered bicycle parking; (f) lighting; (g) surface water management including oil/petrol bypass interceptor; and (h) all associated site development works. Bannatyne Mill is a protected structure RPS Ref: 255 and is listed on the NIAH (National Inventory of Architectural Heritage) Schedule, ref no. 21516002. The removal of; the compressor room, the ESB substation, stone piers and existing boundary wall as described, are subject to an existing Section 57 Declaration (ref: DR18-33)
Application to site progress
-
Applied 24 Oct 2025 2561082
-
Decision Decided... 25 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2561082
for 5 Year Planning Permission for Development - The (1) conservation, restoration and new works to Bannatyne Mill, a protected structure; and (2) change of use of Bannatyne Mill from a grain store to commercial office use at Ted Russell Dock, Dock Road, Limerick City. The proposed works include: (a) demolition and removal of the redundant utility compressor room structure and ESB substation structure situated to the west and to the east of the Bannatyne Mill building respectively; (b) modifications to Bannatyne Mill building including: (i) internal modifications with limited removal of fixtures and fittings, (ii) provision of 3 no. projecting glass windows on the northern, southern and eastern elevations; (c) provision of associated signage; (d) provision of external plant including new ESB substation / utility building and raised heat pump enclosure; (e) modification to layout arrangement including; (i) widening of the existing eastern access including removal of stone piers; (ii) removal of section of boundary wall to Dock Road and replacement with new wall and railings; (iii) provision of on-site car parking and covered bicycle parking; (f) lighting; (g) surface water management including oil/petrol bypass interceptor; and (h) all associated site development works. Bannatyne Mill is a protected structure RPS Ref: 255 and is listed on the NIAH (National Inventory of Architectural Heritage) Schedule, ref no. 21516002. The removal of; the compressor room, the ESB substation, stone piers and existing boundary wall as described, are subject to an existing Section 57 Declaration (ref: DR18-33)
Open official record