Infrastructure · Co. Limerick

The IDA Business and Technology Park, Raheen, Co. Limerick

Granted 25 Mar 2026 (final grant issued 29 Apr 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660084 at The IDA Business and Technology Park, Raheen, Co. Limerick: Additions.
  • The applicant is Eli Lilly Kinsale Ltd. The agent is Shane Traynor.
  • It was received by Limerick City and County Council on 29 Jan 2026.
  • Status: Granted 25 Mar 2026 (final grant issued 29 Apr 2026).
  • Permission was granted on 25 Mar 2026 and the final grant issued on 29 Apr 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Limerick City and County Council planning register, checked 2 Jun 2026. Open the council's file

More planning applications in Raheen · Planning applications in Co. Limerick

What and where

Additions

additions, modifications and alterations to previously permitted Biopharmaceutical Manufacturing Campus (Planning Register Reference Number 22190 and as amended by planning reference 23152 and 2461160) located at the IDA Business and Technology Park, Raheen, County Limerick, V94 2C04. The proposed development will consist of the following: 1. A two-storey biomass boiler house building with internal access mezzanines, sized 1,881 square meters approximately and 17.6 metres high approximately including a boiler stack approximately 21m high all located to the southeast of the existing permitted facility adjacent to Roches Avenue. It is proposed to construct this facility in two phases over five years. 2. It is proposed to relocate a previously permitted generator compound including 2No. generators to the northeast of this proposed biomass boiler house building and to reconfigure and reduce the generator compound. 3. The proposed development also includes the extension of the existing permitted pipe bridge located to the northwest of the biomass boiler house. 4. The proposed development also consists of minor modifications to previously permitted internal roads and footpaths, site lighting, fencing, landscaping and underground drainage system infrastructure. This application will not result in any storm water discharge to the public system. The existing terminal infiltration basin has sufficient capacity to accommodate the additional surface water run off generated by the proposed Biomass Building and associated works. The application relates to a modification to a development which comprises or is for the purposes of an activity requiring an industrial emissions licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required

Location
Raheen, Co. Limerick Map
Planning reference
2660084

Numbers and dates

Floor area
1,881 m²
Project type
Infrastructure
Received
29 Jan 2026
Decision to grant
25 Mar 2026
Final grant
29 Apr 2026

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued

Site history

This site's history

  1. Earlier permission 2461160 for this site: granted 16 Apr 2025, commencement notice filed for a start on 3 Jun 2025.

    a 10-year permission for development at our existing Biopharmaceutical Manufacturing Campus, located at Ballycummin, The IDA Business and… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Permission was granted on 25 Mar 2026 and the final grant issued on 29 Apr 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660084 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Limerick City and County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Raheen

Get alerts for RaheenFree. We email you when new applications appear.

Free email alerts

Get new Raheen projects by email

New applications, decisions and site starts in Raheen, Co. Limerick. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options