Development Description
the renovation and extension of an existing farmhouse, to include re-roofing, elevational changes to windows and doors, construction of a side extension for a utility/boot room, the decommissioning of the existing septic tank, and the installation of a replacement packaged wastewater treatment system with percolation area, together with all ancillary site works