Infrastructure · Co. Limerick

Ballycummin, Raheen, Co. Limerick

Under appeal since 17 Aug 2026 (Granted 7 Aug 2026 by the council)

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660666 at Ballycummin, Raheen, Co. Limerick: Development to extend the existing site and business.
  • The applicant is Brian Geary Motors Ltd. The agent is Mary Hughes Hra Planning.
  • It was received by Limerick City and County Council on 15 Jun 2026.
  • Status: Under appeal since 17 Aug 2026 (Granted 7 Aug 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Limerick City and County Council planning register, checked 25 Aug 2026. Open the council's file

More planning applications in Raheen · Planning applications in Co. Limerick

What and where

Development to extend the existing site and business

development to extend the existing site and business at Ballycummin, Raheen Co. Limerick. The proposed development will comprise: (a) construction of a two-storey motor sales & service facility with photovoltaic panels including a motor showroom and service workshop; (b) Valet building & bin store; (c) car wash; (d) ESB Substation; (e) external plant enclosure; (f) car parking including vehicle display, customer and employee spaces; (g) signage including (a) 1 no. totem sign; (b) 3 no. free standing internal arch signs; (c) 1 no. directional signs; (d) 2 no. facade screens; and (e) building signage; (h) a new entrance off the R526 road; and (i) all associated site works including landscaping, boundary treatment and pedestrian connection to existing operational site A Natura Impact Statement has been prepared in respect of the proposed development and?accompanies?the planning application.

Location
Raheen, Co. Limerick Map
Planning reference
2660666
Applicant
Brian Geary Motors Ltd

Numbers and dates

Project type
Infrastructure
Received
15 Jun 2026
Council decision
7 Aug 2026
Appeal lodged
17 Aug 2026

Timeline

  1. Application received
  2. Granted by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

The Commission lists appeal 501903, lodged on 17 August 2026, as pending. These findings come from the June 2026 Natura Impact Statement received on 15 June 2026. They do not establish a final planning outcome or installed work.

1 official documents inspected · Checked 2026-09-05 · Official file index

Photovoltaic panels are part of the proposed motor facility

Proposed in application · Proposed extension of the existing motor business at Ballycummin, Raheen

What the evidence says
The June 2026 statement describes a two-storey motor showroom and service workshop with photovoltaic panels, alongside a car wash, substation and external plant enclosure. It gives no selected PV system capacity.

Why it may matter — interpretation
Interpretation: identifies a proposed solar package without inventing its size.

What is not established
Panel count, capacity, manufacturer, approval and installation are not established.

Inspect the evidence

Natura Impact Statement: proposed motor facility at Raheen · p.13
with photovoltaic panels · Issued June 2026 (month only) · June 2026; no separate revision identifier stated on the inspected cover; received 2026-06-15 · Checked 2026-09-05

with photovoltaic panels

The tank figure is storage depth, not volume

Proposed in application · June 2026 application drainage description, separate from foul drainage

What the evidence says
The proposed northern attenuation tank has about 2.686 m storage depth and 150 mm connections. Drainage is assessed for a 100-year event with 30% climate and 10% urban-creep allowances; finished floors are at least 500 mm above the modelled drainage water level.

Why it may matter — interpretation
Interpretation: preserves the meaning of the reported dimensions and design event.

What is not established
Tank volume, manufacturer, final engineering approval and installed capacity are not established.

Inspect the evidence

Natura Impact Statement: proposed motor facility at Raheen · p.15
2.686m of storage depth · Issued June 2026 (month only) · June 2026; no separate revision identifier stated on the inspected cover; received 2026-06-15 · Checked 2026-09-05

2.686m of storage depth

Rain gardens use a specified soil depth and overflow route

Proposed in application · Nature-based drainage within the proposed development

What the evidence says
Rain gardens are proposed with about 900 mm of highly permeable soil and low-level perforated pipes. Swales use permeable geotextile and high-level overflows. These are application-stage drainage features, not installed landscape works.

Why it may matter — interpretation
Interpretation: identifies construction details for the proposed drainage landscape.

What is not established
Final locations, quantities, planting specification and installation are not established.

Inspect the evidence

Natura Impact Statement: proposed motor facility at Raheen · p.16
approximately 900 mm · Issued June 2026 (month only) · June 2026; no separate revision identifier stated on the inspected cover; received 2026-06-15 · Checked 2026-09-05

approximately 900 mm

The report needs a coordinated oil-treatment interpretation

Application treatment scope requires clarification · Two treatment statements in the same June 2026 application report

What the evidence says
One passage describes permeable pavements as an agreed-in-principle alternative to conventional oil separators. The next page still proposes a Class 1 bypass separator upstream of attenuation for parking and circulation runoff. The report does not clearly reconcile those treatment scopes.

Why it may matter — interpretation
Interpretation: neither omits the proposed separator nor assumes it treats every paved catchment.

What is not established
A coordinated approved drainage drawing and the exact separator catchment remain to be checked.

Inspect the evidence

Natura Impact Statement: proposed motor facility at Raheen · p.16
alternative to conventional oil separators · Issued June 2026 (month only) · June 2026; no separate revision identifier stated on the inspected cover; received 2026-06-15 · Checked 2026-09-05

alternative to conventional oil separators

Natura Impact Statement: proposed motor facility at Raheen · p.17
Class 1 bypass separator · Issued June 2026 (month only) · June 2026; no separate revision identifier stated on the inspected cover; received 2026-06-15 · Checked 2026-09-05

Class 1 bypass separator
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 1 government-published PDFs were visually inspected. The Commission page exposes one PDF. Six selected pages were visually inspected. The separate engineer report, council conditions, complete site drawings and later appeal submissions have not been inspected. Proposals do not establish procurement or installed work.

How we know this

From the Limerick City and County Council planning register, checked 25 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Raheen

Get alerts for RaheenFree. We email you when new applications appear.

Free email alerts

Get new Raheen projects by email

New applications, decisions and site starts in Raheen, Co. Limerick. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options