Temporary/event · Co. Limerick

Shannon Rowing Club, Sarsfield Bridge, Limerick

Decision to grant 10 Nov 2026, open to appeal until 7 Dec 2026

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660802 at Shannon Rowing Club, Sarsfield Bridge, Limerick: Temporary.
  • It was received by Limerick City and County Council on 14 Jul 2026.
  • Status: Decision to grant 10 Nov 2026, open to appeal until 7 Dec 2026.
  • The council decided on 10 Nov 2026 to grant permission. The decision is open to appeal until 7 Dec 2026; the final grant issues after that if there is no appeal, and building work cannot start before it. No site start has been filed yet.

Source: the Limerick City and County Council planning register, checked 19 Nov 2026. Open the council's file

Planning applications in Co. Limerick

What and where

Temporary

the temporary (5 years) placement of a purpose-built prefabricated sauna structure on the curtilage of the site. The proposed development and all associated groundwork connect to existing external infrastructure with no demolition or change to the protected structure and are designed to be in keeping with the design requirements of the existing protected structure using a foundation that is soft touch and reversible. Shannon Rowing Club is on the NIAH (National Inventory of Architectural Heritage) Schedule, Ref no: 21512011 and a Protected Structure RPS reg no: 3271; the site is adjacent to Harbour Pier and Lock NIAH Ref no:21512015, RPS: 6060.

Description as published by the council. Its text starts part-way through a sentence.

Location
Sarsfield Bridge, Co. Limerick Map
Planning reference
2660802
Application type
Permission

Numbers and dates

Project type
Temporary/event
Received
14 Jul 2026
Decision to grant
10 Nov 2026
Appeals until
7 Dec 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Further information requested
  3. Further information received
  4. Decision to grant

Outlook

What happens next

The council decided on 10 Nov 2026 to grant permission. The decision is open to appeal until 7 Dec 2026; the final grant issues after that if there is no appeal, and building work cannot start before it. No site start has been filed yet.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660802 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Limerick City and County Council planning register, checked 19 Nov 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Sarsfield Bridge

Get alerts for Co. LimerickFree. We email you when new applications appear.

Free email alerts

Get new Limerick projects by email

New applications, decisions and site starts in Co. Limerick. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options